Home > Montenegro > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Montenegro

Soundproofing materials in Montenegro

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Montenegro. Made at our own plant in India and shipped into Bar on the Adriatic, then a short road run to almost anywhere on the coast.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

This comes from our own plant, not a trading desk. We do not have an office in your city and we will not invent one. What we can give you is factory pricing, consistent material and a technical answer before you commit.

01 / The material

What this material is and where it earns its place in Montenegro

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Montenegro is mostly coastal hotels and marinas, restaurants, apartments, offices, schools, clinics.

Stone and concrete construction with hard floors, and coastal resort stock with tile throughout.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Montenegro.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Data sheet

One specification sheet, the same in every market

These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

On a Montenegro job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

03 / In this market

What we see driving Montenegro briefs

  • Stone and hard interiors

    Local stone and tile in generous volumes hold sound for a long time, so ceiling absorption usually does most of the work.

  • Season openings are fixed

    Coastal work has to finish before the season. Real dispatch and transit dates matter more than a marginally better price.

  • A short road leg

    Bar is close to the whole coast, so the inland cost is low and the landed price is predictable.

  • Sea air and humidity

    PET felt does not absorb moisture, rot or feed mould, which matters where mineral products sag within a couple of seasons.

  • Plant and HVAC

    Split units with condensers on facades close to guest rooms, running hard through the season.

  • The housing stock

    Stone and concrete construction with hard floors, and coastal resort stock with tile throughout.

Architects working in Montenegro usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

04 / Conditions

Durability in Montenegro, before acoustics is discussed

Montenegro is mild summers and cold, wet winters, and that narrows the sensible material list before acoustics is even discussed.

Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.

The risk we design against here is condensation and cold bridging behind new linings.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

05 / Logistics

Getting it to Montenegro, with real dates

Supply into Montenegro
Ships fromPalwal, Haryana, India
Arrives atBar, then a short road run to site
Dispatch4 to 7 working days
FreightSea via Bar
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Bar, then a short road run to site. Air freight for samples and urgent quantities.

06 / Worth knowing

The things worth knowing before you place the order

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • Coverage bought instead of a target

    Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.

  • A claim of being local to Montenegro

    We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.

07 / In projects

In finished rooms

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Montenegro: questions we are actually asked

Do you manufacture soundproofing materials in Montenegro?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Montenegro as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Bar on the Adriatic, then a short road run to almost anywhere on the coast. You buy at factory prices with one consistent batch across the order.

What decides the specification for a Montenegro project?

Local stone and tile in generous volumes hold sound for a long time, so ceiling absorption usually does most of the work. Coastal work has to finish before the season. Real dispatch and transit dates matter more than a marginally better price. Those two things move the build-up far more than the panel figure does.

Will this material last in the Montenegro climate?

Montenegro is mild summers and cold, wet winters. Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air. The failure we design against here is condensation and cold bridging behind new linings.

When would material land on a Montenegro site?

ships from: Palwal, Haryana, India, arrives at: Bar, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What will soundproofing materials not do?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

Is there a minimum order, and how does it arrive?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send a plan and a section, get a real build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.