Home > Mecca > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in Mecca

Recording studio acoustics and soundproofing in Mecca

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. Media and content production is growing quickly, and rooms are being built inside existing commercial shells with no isolation plan. The background noise floor is usually the first problem to solve.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / Start here

What this material is and where it earns its place in Mecca

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

Media and content production is growing quickly, and rooms are being built inside existing commercial shells with no isolation plan. The background noise floor is usually the first problem to solve.

Work reaching us from Mecca is mostly hotel guest rooms and corridors, lobbies, assembly and function halls, offices, clinics.

  • Rooms occupied around the clock In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.
  • Refurbishment windows do not move Work happens between seasons, on dates fixed long in advance. We give real dispatch and transit dates so the programme is not waiting on a container that will not land in time.
  • Repeat detail at scale A thousand rooms means the same build-up a thousand times. Consistent thickness and density across the whole order matters more than the headline figure on any one sheet.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Mecca.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

How the layers stack, from the structure inwards

  1. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 1

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Mecca, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.

    Corner loading. Low frequency energy collects in corners, so absorber in the corners does more than the same area spread across a wall.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Mecca, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.

    Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.

  3. ...

    Layer 3

    Soundproof curtains

    A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Mecca, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.

    Double layer at a doorway. Two curtains with an air gap where a single layer will not reach the target.

Architects working in Mecca usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

What we see driving Mecca briefs

  • Rooms occupied around the clock

    In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.

  • Refurbishment windows do not move

    Work happens between seasons, on dates fixed long in advance. We give real dispatch and transit dates so the programme is not waiting on a container that will not land in time.

  • Repeat detail at scale

    A thousand rooms means the same build-up a thousand times. Consistent thickness and density across the whole order matters more than the headline figure on any one sheet.

  • Halls built for crowds

    Large assembly and function spaces in hard concrete carry long reverberation. Speech stops being intelligible long before the room sounds obviously wrong.

  • The housing stock

    Villas and apartment blocks are concrete and block with hard stone or tile throughout. Mass is there, but every room is live and impact noise between floors is untreated.

  • The studio and content scene

    Media and content production is growing quickly, and rooms are being built inside existing commercial shells with no isolation plan. The background noise floor is usually the first problem to solve.

04 / Room by room

Where the money goes on a Mecca project

  • Recording studio soundproof wall system

    Isolation

    A measured background level, agreed before anything is bought. In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.

  • Acoustic foam and panels in a recording studio

    Low frequency

    Corner and boundary absorption with real depth, not surface foam. Work happens between seasons, on dates fixed long in advance. We give real dispatch and transit dates so the programme is not waiting on a container that will not land in time.

  • Studio door and control room window

    Early reflections

    Controlled at the mix position, and only there. A thousand rooms means the same build-up a thousand times. Consistent thickness and density across the whole order matters more than the headline figure on any one sheet.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Conditions

Why the climate in Mecca changes the material, not the target

Mecca is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The failure we design against here is dust ingress and thermal movement in long runs.

Where a consultant is already engaged on a Mecca project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Worth knowing

The six errors that cost the most

  • Buying foam to solve an isolation problem

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating the room before the shell is isolated

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Killing the room completely and calling it controlled

    More absorption is not better absorption. Past the target the room goes flat and people raise their voices to compensate.

  • Treating it as a generic Mecca job

    In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.

05 / Getting it there

How material reaches a Mecca site

Supply into Mecca
Ships fromPalwal, Haryana, India
Arrives atJeddah, then a short road run to site
Dispatch4 to 7 working days
FreightSea via Jeddah
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Jeddah, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Mecca projects

What makes recording studio acoustics and soundproofing different in Mecca?

Media and content production is growing quickly, and rooms are being built inside existing commercial shells with no isolation plan. The background noise floor is usually the first problem to solve. In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.

Where should the budget go first on a Mecca project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Mecca?

No. We manufacture in India and supply into Mecca. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Mecca site?

ships from: Palwal, Haryana, India, arrives at: Jeddah, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.