For projects in Mecca
Cinema and multiplex soundproofing in Mecca
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
The product, described honestly, for a Mecca brief
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Work reaching us from Mecca is mostly hotel guest rooms and corridors, lobbies, assembly and function halls, offices, clinics.
- Rooms occupied around the clock In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.
- Refurbishment windows do not move Work happens between seasons, on dates fixed long in advance. We give real dispatch and transit dates so the programme is not waiting on a container that will not land in time.
- Repeat detail at scale A thousand rooms means the same build-up a thousand times. Consistent thickness and density across the whole order matters more than the headline figure on any one sheet.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Mecca.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Mecca, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Mecca, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Mecca, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
If you are specifying for a Mecca project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What decides the build-up in Mecca
- Rooms occupied around the clock
In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.
- Refurbishment windows do not move
Work happens between seasons, on dates fixed long in advance. We give real dispatch and transit dates so the programme is not waiting on a container that will not land in time.
- Repeat detail at scale
A thousand rooms means the same build-up a thousand times. Consistent thickness and density across the whole order matters more than the headline figure on any one sheet.
- Halls built for crowds
Large assembly and function spaces in hard concrete carry long reverberation. Speech stops being intelligible long before the room sounds obviously wrong.
- Assembly and performance rooms
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
04 / Room by room
Space by space, for Mecca briefs
-

Screen to screen
Independent construction between auditoria, with services broken at the line. In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- PET felt acoustic panels, 4 to 24 mm
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Work happens between seasons, on dates fixed long in advance. We give real dispatch and transit dates so the programme is not waiting on a container that will not land in time.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
-

Plant and projection
Equipment noise into the auditorium, treated at source. A thousand rooms means the same build-up a thousand times. Consistent thickness and density across the whole order matters more than the headline figure on any one sheet.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- PET felt acoustic panels, 2440 x 4270 mm, 2.44 x 4.27 m, 8 x 14 ft
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate and durability
The Mecca climate decides the material list
Mecca is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Straight talk
What we watch go wrong on jobs like this
-
A shared service void running across the wall line
A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.
-
Treating the auditorium to fix bleed from the next screen
It sounds like a small detail until the room is finished and the complaint arrives.
-
Doors and lobbies specified late and undersized
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Mecca job
In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.
05 / Route to site
What the route into Mecca actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Jeddah, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Jeddah |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Jeddah, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Mecca projects
What makes cinema and multiplex soundproofing different in Mecca?
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief. In peak season somebody is always asleep and somebody is always in the corridor. Guest room isolation carries the whole guest experience, and door and corridor details cause more complaints than walls do.
Where should the budget go first on a Mecca project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Mecca?
No. We manufacture in India and supply into Mecca. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Mecca site?
ships from: Palwal, Haryana, India, arrives at: Jeddah, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.