Home > Manila > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in Manila

Recording studio acoustics and soundproofing in Manila

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A very large content, dubbing and music sector working inside commercial floors with thin partitions.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / The material

What this material is and where it earns its place in Manila

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

A very large content, dubbing and music sector working inside commercial floors with thin partitions.

Work reaching us from Manila is mostly service and call centre floors, offices, condominium towers, hotels, hospitals, schools.

  • Hundreds of simultaneous conversations A call floor is not an echo problem. Absorption alone will not deliver privacy or intelligibility, so ceiling, screens and layout have to work together.
  • Concrete towers, hard interiors The structure blocks well. The problem is tile and glass making the room ring, and impact passing down through slabs.
  • Typhoon season and humidity PET felt does not absorb moisture, rot or feed mould, which matters where mineral products sag within a season.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Manila.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

The build-up, layer by layer

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Manila, split units and VRF running at full load year round, with condensers close to occupied rooms.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Manila, church buildings, gymnasiums and function halls carry amplified speech and music in hard volumes.

    Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.

  3. ...

    Layer 3

    Soundproof curtains

    A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Manila, classrooms are hard and naturally ventilated with very large class sizes and open corridors.

    Track with a seal. Ceiling track plus a floor seal or drape, so the perimeter is closed when it is drawn.

Architects working in Manila usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / On the ground

What the buildings in Manila do to the specification

  • Hundreds of simultaneous conversations

    A call floor is not an echo problem. Absorption alone will not deliver privacy or intelligibility, so ceiling, screens and layout have to work together.

  • Concrete towers, hard interiors

    The structure blocks well. The problem is tile and glass making the room ring, and impact passing down through slabs.

  • Typhoon season and humidity

    PET felt does not absorb moisture, rot or feed mould, which matters where mineral products sag within a season.

  • Traffic outside, all day

    Street noise reaches rooms through glazing rather than walls, so the facade is where the first money should go.

  • The housing stock

    Concrete and block construction with hard floors, in condominium towers and low rise housing that share walls and slabs.

  • The studio and content scene

    A very large content, dubbing and music sector working inside commercial floors with thin partitions.

04 / Room by room

Room by room, on a typical Manila job

  • Recording studio soundproof wall system

    Isolation

    A measured background level, agreed before anything is bought. A call floor is not an echo problem. Absorption alone will not deliver privacy or intelligibility, so ceiling, screens and layout have to work together.

  • Acoustic foam and panels in a recording studio

    Low frequency

    Corner and boundary absorption with real depth, not surface foam. The structure blocks well. The problem is tile and glass making the room ring, and impact passing down through slabs.

  • Studio door and control room window

    Early reflections

    Controlled at the mix position, and only there. PET felt does not absorb moisture, rot or feed mould, which matters where mineral products sag within a season.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Durability

Why the climate in Manila changes the material, not the target

Manila is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

Where a consultant is already engaged on a Manila project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Worth knowing

Six mistakes that turn into a second fit-out

  • Buying foam to solve an isolation problem

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating the room before the shell is isolated

    Small on the drawing, expensive on site, and almost always found after handover.

  • Killing the room completely and calling it controlled

    We would rather calculate the area and sell you less of it than line every surface and call it thorough.

  • Treating it as a generic Manila job

    A call floor is not an echo problem. Absorption alone will not deliver privacy or intelligibility, so ceiling, screens and layout have to work together.

05 / Getting it there

How material reaches a Manila site

Supply into Manila
Ships fromPalwal, Haryana, India
Arrives atManila, then a short road run to site
Dispatch4 to 7 working days
FreightSea via Manila
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Manila, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Manila projects

What makes recording studio acoustics and soundproofing different in Manila?

A very large content, dubbing and music sector working inside commercial floors with thin partitions. A call floor is not an echo problem. Absorption alone will not deliver privacy or intelligibility, so ceiling, screens and layout have to work together.

Where should the budget go first on a Manila project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Manila?

No. We manufacture in India and supply into Manila. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Manila site?

ships from: Palwal, Haryana, India, arrives at: Manila, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.