Manufactured in India, supplied in Manesar
Ceiling baffles and clouds in Manesar
We manufacture ceiling baffles and clouds at our own plant at Palwal in Haryana, India, and supply them into Manesar. Manesar is an hour from our plant.
- Material
- 100% PET non-woven, the panel family
- Thickness
- 9 to 24 mm
- Size
- Made to the drawing, standard and custom
- Exposure
- Both faces work, which is why suspended area outperforms the same area laid flat
- Test standard
- ASTM C423
- Lead time
- Confirmed against the drawing
- Minimum order
- 500 sq ft, about 46 sq m
- ASTM C423
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.
01 / The material
What you are buying, and what it fixes in Manesar
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. It is how you treat a room with exposed services, where there is no ceiling to line.
Work reaching us from Manesar is mostly automotive and component plants, QC and test rooms, corporate offices, training rooms, canteens.
Builder floors and RC frame apartments with tile and stone floors, often built floor by floor for separate households.
- Vertical baffles Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.
- Horizontal clouds Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.
- Mixed with services Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
- What it will not do Baffles are efficient, not magic. In a very tall volume the height above the baffle line still rings, and the honest answer is either more area or accepting a higher RT, not a denser panel.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for baffles and clouds are on the main product page. This page covers what that means for a project in Manesar.
Acoustic ceiling baffles Acoustic ceiling clouds Acoustic ceiling tiles
02 / Data sheet
The published figures, unchanged by location
These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.
- EchoCore 151500 GSM. Offices, retail, general
- EchoPro 181800 GSM. Halls, atria, spaces with a target
- EchoMax 222200 GSM. High volume and high occupancy
| Material | 100% PET non-woven, the panel family |
|---|---|
| Thickness | 9 to 24 mm |
| Size | Made to the drawing, standard and custom |
| Exposure | Both faces work, which is why suspended area outperforms the same area laid flat |
| Test standard | ASTM C423 |
On a Manesar job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
03 / On the ground
What the buildings in Manesar do to the specification
- Continuous machinery
Presses, robots and conveyors run all shift. The fix is enclosure and barrier at the source, not absorption at the far wall.
- Test and measurement rooms
NVH and QC rooms need a low background before any measurement means anything. That is isolation work with a written target.
- An hour from the plant
Short road run, so samples arrive next day and full loads are cheap to move.
- Training and briefing rooms
Rooms where instructions have to be understood over plant noise need intelligibility, not just less echo.
- School and campus buildings
Classrooms are concrete and tile with bare walls and high ceilings, and class sizes push levels up. Corridors act as reverberation chambers that feed every room off them.
Architects working in Manesar usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
04 / Durability
What the Manesar climate rules in and rules out
Manesar is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
05 / Route to site
Getting it to Manesar, with real dates
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | a day |
| Dispatch | 2 to 4 working days |
| To site | a day |
| Packing | Flat packed with fixings, sets labelled by row so the install sequence matches the drawing. |
| Lead time | Confirmed against the drawing. Standard sizes 4 to 7 working days. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
Same day or next day by road from Palwal. Small consignments go on a shared vehicle, full loads on a dedicated truck.
500 sq ft, about 46 sq m, across baffles and clouds together.
| Baffles and clouds | 500 sq ft, about 46 sq m |
|---|
Baffles and clouds are cut to the drawing, so the minimum is counted on finished panel area. Both faces of a hung baffle absorb, which is why coverage taken off a plan understates what the order actually does.
06 / Before you buy
Where this goes wrong, said plainly
-
The wrong product for the problem
Baffles are efficient, not magic. In a very tall volume the height above the baffle line still rings, and the honest answer is either more area or accepting a higher RT, not a denser panel.
-
Coverage bought instead of a target
Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.
-
A claim of being local to Manesar
We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.
Manesar: questions we are actually asked
Is there a Manesar factory behind this product?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Manesar as the manufacturer rather than through a dealer. Manesar is an hour from our plant. You buy at factory prices with one consistent batch across the order.
What decides the specification for a Manesar project?
Presses, robots and conveyors run all shift. The fix is enclosure and barrier at the source, not absorption at the far wall. NVH and QC rooms need a low background before any measurement means anything. That is isolation work with a written target. Those two things move the build-up far more than the panel figure does.
Does Manesar weather shorten the life of this material?
Manesar is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
When would material land on a Manesar site?
made at: Our own plant, Palwal, Haryana, reaches site in: a day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
When are ceiling baffles and clouds the wrong purchase?
Baffles are efficient, not magic. In a very tall volume the height above the baffle line still rings, and the honest answer is either more area or accepting a higher RT, not a denser panel.
Is there a minimum order, and how does it arrive?
500 sq ft, about 46 sq m, across baffles and clouds together. Baffles and clouds, 500 sq ft, about 46 sq m. Baffles and clouds are cut to the drawing, so the minimum is counted on finished panel area. Both faces of a hung baffle absorb, which is why coverage taken off a plan understates what the order actually does. Flat packed with fixings, sets labelled by row so the install sequence matches the drawing.
Next step
Drawings in, BOQ and a delivered date out
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.