Home > London > Hospital and healthcare acoustics

Hospital corridor with acoustic ceiling and wall treatment

For projects in London

Hospital and healthcare acoustics in London

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest.

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work.
Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime.
Quote
From a plan and a section, within 48 hours

01 / The product

What this is, and what it changes in a London room

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.

Older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest.

Work reaching us from London is mostly flat conversions, offices, studios, bars and restaurants, schools, clinics.

  • Rail and Underground rumble Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
  • Single brick party walls A joist floor between two flats was never built for two households. Membrane plus an independent lining, then absorption.
  • Night economy neighbours Soho, Shoreditch, Camden and Clapham venues sit under flats. Bass containment and table-level comfort are two different jobs.
  • Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in London.

Hospital soundproofing

02 / The build-up

The build-up, layer by layer

  1. Acoustic hanging ceiling baffles in a large open space

    Layer 1

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In London, older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest.

    Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In London, church buildings, village and parish halls, and school halls carry speech, music and sport in one long-decay volume.

    Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.

  3. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 3

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In London, school buildings mix Victorian halls with post war system build and new academies, so hard floors, high ceilings and long corridors are the constant.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

Architects working in London usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

What decides the build-up in London

  • Rail and Underground rumble

    Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.

  • Single brick party walls

    A joist floor between two flats was never built for two households. Membrane plus an independent lining, then absorption.

  • Night economy neighbours

    Soho, Shoreditch, Camden and Clapham venues sit under flats. Bass containment and table-level comfort are two different jobs.

  • Damp winters

    PET felt does not absorb moisture, shed fibre or feed mould, which matters in older stock with cold wall build-ups.

  • Plant and HVAC

    Older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest.

04 / Room by room

Where the money goes on a London project

  • Hospital consultation room with acoustic wall treatment

    Consulting room privacy

    Speech privacy between rooms, which is partition, door and ceiling void work. Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.

  • Hospital corridor with acoustic ceiling baffles and clouds

    Ward noise floor

    Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. A joist floor between two flats was never built for two households. Membrane plus an independent lining, then absorption.

  • Hospital corridor doors with acoustic seals and curtains

    Cleanability

    Non shedding, non absorbent surfaces that survive a cleaning regime. Soho, Shoreditch, Camden and Clapham venues sit under flats. Bass containment and table-level comfort are two different jobs.

For a London interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate

What the London climate rules in and rules out

London is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

Where a consultant is already engaged on a London project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Before you buy

Six mistakes that turn into a second fit-out

  • Fabric wrapped products in a clinical area

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Absorption used where privacy was the requirement

    Privacy is a transmission problem. Absorption makes the room sound nicer and does not stop anyone hearing through the wall.

  • Ceiling void left open above a partition

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating it as a generic London job

    Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.

05 / Route to site

Supply into London, start to site

Supply into London
Ships fromPalwal, Haryana, India
Arrives atFelixstowe, London Gateway or Southampton
Dispatch4 to 7 working days
FreightSea and air
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order, not after.

Sea freight to Felixstowe, London Gateway or Southampton. Air freight for samples and urgent quantities. Clearance through your agent or ours.

FAQ

Questions from London projects

What makes hospital and healthcare acoustics different in London?

Older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest. Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.

Where should the budget go first on a London project?

Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.

Do you have an office or installation team in London?

No. We manufacture in India and supply into London. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a London site?

ships from: Palwal, Haryana, India, arrives at: Felixstowe, London Gateway or Southampton, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.

script src="/assets/vendor/glightbox/js/glightbox.min.js">