For projects in London
Hospital and healthcare acoustics in London
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest.
- Consulting room privacy
- Speech privacy between rooms, which is partition, door and ceiling void work.
- Ward noise floor
- Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
- Cleanability
- Non shedding, non absorbent surfaces that survive a cleaning regime.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this is, and what it changes in a London room
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.
Older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest.
Work reaching us from London is mostly flat conversions, offices, studios, bars and restaurants, schools, clinics.
- Rail and Underground rumble Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
- Single brick party walls A joist floor between two flats was never built for two households. Membrane plus an independent lining, then absorption.
- Night economy neighbours Soho, Shoreditch, Camden and Clapham venues sit under flats. Bass containment and table-level comfort are two different jobs.
- Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in London.
02 / The build-up
The build-up, layer by layer
-

Layer 1
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In London, older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest.
Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In London, church buildings, village and parish halls, and school halls carry speech, music and sport in one long-decay volume.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
-

Layer 3
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In London, school buildings mix Victorian halls with post war system build and new academies, so hard floors, high ceilings and long corridors are the constant.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
Architects working in London usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / In this market
What decides the build-up in London
- Rail and Underground rumble
Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
- Single brick party walls
A joist floor between two flats was never built for two households. Membrane plus an independent lining, then absorption.
- Night economy neighbours
Soho, Shoreditch, Camden and Clapham venues sit under flats. Bass containment and table-level comfort are two different jobs.
- Damp winters
PET felt does not absorb moisture, shed fibre or feed mould, which matters in older stock with cold wall build-ups.
- Plant and HVAC
Older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest.
04 / Room by room
Where the money goes on a London project
-

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work. Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. A joist floor between two flats was never built for two households. Membrane plus an independent lining, then absorption.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
-

Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime. Soho, Shoreditch, Camden and Clapham venues sit under flats. Bass containment and table-level comfort are two different jobs.
- PET felt acoustic panels, 4 to 24 mm
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
For a London interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate
What the London climate rules in and rules out
London is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Where a consultant is already engaged on a London project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Before you buy
Six mistakes that turn into a second fit-out
-
Fabric wrapped products in a clinical area
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Absorption used where privacy was the requirement
Privacy is a transmission problem. Absorption makes the room sound nicer and does not stop anyone hearing through the wall.
-
Ceiling void left open above a partition
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating it as a generic London job
Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
05 / Route to site
Supply into London, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Felixstowe, London Gateway or Southampton |
| Dispatch | 4 to 7 working days |
| Freight | Sea and air |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order, not after.
Sea freight to Felixstowe, London Gateway or Southampton. Air freight for samples and urgent quantities. Clearance through your agent or ours.
Questions from London projects
What makes hospital and healthcare acoustics different in London?
Older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest. Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
Where should the budget go first on a London project?
Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Do you have an office or installation team in London?
No. We manufacture in India and supply into London. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a London site?
ships from: Palwal, Haryana, India, arrives at: Felixstowe, London Gateway or Southampton, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.