For projects in Jeddah
Cinema and multiplex soundproofing in Jeddah
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this material is and where it earns its place in Jeddah
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Work reaching us from Jeddah is mostly hotels and hospitality, corporate offices, apartments, hospitals, schools, retail.
- The port is at the city Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
- A gateway for pilgrimage hospitality Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
- Coastal humidity PET felt does not absorb moisture, shed fibre or feed mould, which matters on a humid Red Sea coast where mineral products sag.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Jeddah.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Jeddah, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Jeddah, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Jeddah, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.
Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.
For a Jeddah practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
The Jeddah conditions that change the answer
- The port is at the city
Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
- A gateway for pilgrimage hospitality
Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
- Coastal humidity
PET felt does not absorb moisture, shed fibre or feed mould, which matters on a humid Red Sea coast where mineral products sag.
- Guest rooms fail at the door
Corridor noise and the next room cause more complaints than room acoustics. Door and wall detailing is where the work is.
- Assembly and performance rooms
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
04 / Room by room
Room by room, on a typical Jeddah job
-

Screen to screen
Independent construction between auditoria, with services broken at the line. Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Acoustic carpet and rugs, High density polyester
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Acoustic carpet and rugs, Felt
-

Plant and projection
Equipment noise into the auditorium, treated at source. PET felt does not absorb moisture, shed fibre or feed mould, which matters on a humid Red Sea coast where mineral products sag.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
- Acoustic carpet and rugs, 64 sq ft per pack
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Durability
What the Jeddah climate rules in and rules out
Jeddah is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Straight talk
The six errors that cost the most
-
A shared service void running across the wall line
A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.
-
Treating the auditorium to fix bleed from the next screen
This is the one that comes back as a second fit-out rather than a snag.
-
Doors and lobbies specified late and undersized
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Jeddah job
Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
05 / Getting it there
Supply into Jeddah, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Jeddah, then a short road run or onward inland |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Jeddah |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight direct into Jeddah, then a short road run to site or onward inland. Air freight for samples and urgent quantities.
Questions from Jeddah projects
What makes cinema and multiplex soundproofing different in Jeddah?
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief. Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
Where should the budget go first on a Jeddah project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Jeddah?
No. We manufacture in India and supply into Jeddah. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Jeddah site?
ships from: Palwal, Haryana, India, arrives at: Jeddah, then a short road run or onward inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.