Manufactured in India, supplied in Jaipur
Soundproofing materials in Jaipur
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Jaipur. Jaipur is two hundred and fifty kilometres from our plant, so material arrives next day.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
This comes from our own plant, not a trading desk. We do not have an office in your city and we will not invent one. What we can give you is factory pricing, consistent material and a technical answer before you commit.
01 / What it is
The material, and what it actually does on a Jaipur job
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Jaipur is mostly heritage hotels, wedding and banquet venues, jewellery workshops, offices, schools, clinics.
Stone and RC construction with stone floors throughout, in a dry dusty climate where dust ingress matters more than damp.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Jaipur.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification sheet
One specification sheet, the same in every market
These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
03 / On the ground
What decides the build-up in Jaipur
- The venue is the product
A banquet hall has to hold amplified music and still let a speech be understood. Those pull in opposite directions unless the ceiling is handled properly.
- Heritage fabric stays
Stone, lime plaster and high ceilings that cannot be altered. Work has to be internal, shallow and ideally reversible.
- Workshops and cutting
Gem and jewellery units where cutting and polishing run all day close to occupied areas.
- Next day from the plant
A few hours by road. Low freight cost, quick samples, and easy replacement.
- Plant and HVAC
Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.
- The housing stock
Stone and RC construction with stone floors throughout, in a dry dusty climate where dust ingress matters more than damp.
If you are specifying for a Jaipur project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
04 / Climate and durability
Why the climate in Jaipur changes the material, not the target
Jaipur is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the sensible material list before acoustics is even discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The risk we design against here is dust ingress and thermal movement in long runs.
For a Jaipur interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
05 / Route to site
Getting it to Jaipur, with real dates
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | a day |
| Dispatch | 2 to 4 working days |
| To site | a day |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly two hundred and fifty kilometres, usually next day on a dedicated truck.
06 / Before you buy
What we will tell you that a reseller will not
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Coverage bought instead of a target
Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.
-
Suppliers who imply a Jaipur presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
The product on finished jobs
Jaipur: questions we are actually asked
Is there a Jaipur factory behind this product?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Jaipur as the manufacturer rather than through a dealer. Jaipur is two hundred and fifty kilometres from our plant, so material arrives next day. You buy at factory prices with one consistent batch across the order.
What decides the specification for a Jaipur project?
A banquet hall has to hold amplified music and still let a speech be understood. Those pull in opposite directions unless the ceiling is handled properly. Stone, lime plaster and high ceilings that cannot be altered. Work has to be internal, shallow and ideally reversible. Those two things move the build-up far more than the panel figure does.
Is this the right material for Jaipur conditions?
Jaipur is hot and dry for most of the year, with dust and high daytime surface temperatures. Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves. The failure we design against here is dust ingress and thermal movement in long runs.
When would material land on a Jaipur site?
made at: Our own plant, Palwal, Haryana, reaches site in: a day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
How is the order packed and what is the minimum?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Tell us the room, we will tell you the build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.