Home > Jaipur > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Jaipur

HVAC, plant and machine noise control in Jaipur

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / Start here

The material, and what it actually does on a Jaipur job

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.

Work reaching us from Jaipur is mostly heritage hotels, wedding and banquet venues, jewellery workshops, offices, schools, clinics.

  • The venue is the product A banquet hall has to hold amplified music and still let a speech be understood. Those pull in opposite directions unless the ceiling is handled properly.
  • Heritage fabric stays Stone, lime plaster and high ceilings that cannot be altered. Work has to be internal, shallow and ideally reversible.
  • Workshops and cutting Gem and jewellery units where cutting and polishing run all day close to occupied areas.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Jaipur.

HVAC duct soundproofing Machine noise control

02 / The build-up

How the layers stack, from the structure inwards

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Jaipur, split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

  2. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 2

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Jaipur, palace hotels, banquet halls and auditoria are very large stone volumes with long decay times.

    First reflection points. Mirror trick placement on side walls and ceiling, which is a handful of panels rather than a lined room.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Jaipur, school buildings are stone and concrete with high ceilings and courtyards that amplify break time noise.

    Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / In this market

The Jaipur conditions that change the answer

  • The venue is the product

    A banquet hall has to hold amplified music and still let a speech be understood. Those pull in opposite directions unless the ceiling is handled properly.

  • Heritage fabric stays

    Stone, lime plaster and high ceilings that cannot be altered. Work has to be internal, shallow and ideally reversible.

  • Workshops and cutting

    Gem and jewellery units where cutting and polishing run all day close to occupied areas.

  • Next day from the plant

    A few hours by road. Low freight cost, quick samples, and easy replacement.

  • Plant and HVAC

    Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.

04 / Room by room

Space by space, for Jaipur briefs

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate

Durability in Jaipur, before acoustics is discussed

Jaipur is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The failure we design against here is dust ingress and thermal movement in long runs.

On a Jaipur job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Read this first

The six errors that cost the most

  • Absorption on the office wall for a plant room problem

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Ignoring structure borne vibration through the mounts

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic Jaipur job

    A banquet hall has to hold amplified music and still let a speech be understood. Those pull in opposite directions unless the ceiling is handled properly.

05 / Route to site

Getting it to Jaipur, with real dates

Supply into Jaipur
Made atOur own plant, Palwal, Haryana
Reaches site ina day
Dispatch2 to 4 working days
To sitea day
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

By road from Palwal, roughly two hundred and fifty kilometres, usually next day on a dedicated truck.

FAQ

Questions from Jaipur projects

What makes HVAC, plant and machine noise control different in Jaipur?

Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs. A banquet hall has to hold amplified music and still let a speech be understood. Those pull in opposite directions unless the ceiling is handled properly.

Where should the budget go first on a Jaipur project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Jaipur?

No. We manufacture in India and supply into Jaipur. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Jaipur site?

made at: Our own plant, Palwal, Haryana, reaches site in: a day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.