Home > Istanbul > Cinema and multiplex soundproofing

Premium multiplex cinema auditorium with acoustic treatment

For projects in Istanbul

Cinema and multiplex soundproofing in Istanbul

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.

Screen to screen
Independent construction between auditoria, with services broken at the line.
In room response
Heavy absorption on side and rear walls so the mix is heard as intended.
Plant and projection
Equipment noise into the auditorium, treated at source.
Quote
From a plan and a section, within 48 hours

01 / Start here

What this is, and what it changes in a Istanbul room

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.

Mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.

Work reaching us from Istanbul is mostly apartment blocks, hotels, offices and towers, restaurants, hospitals, schools.

  • Built to move Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.
  • Concrete blocks, live rooms The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.
  • A city that never goes quiet Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.
  • Screen to screen Independent construction between auditoria, with services broken at the line.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Istanbul.

Multiplex and cinema soundproofing

02 / The build-up

The build-up, layer by layer

  1. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 1

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Istanbul, split units and VRF with condensers on facades and in light wells close to bedrooms.

    Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Istanbul, mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.

    Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.

  3. PET acoustic felt wall panels in office interior

    Layer 3

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Istanbul, classrooms are concrete and tile with large class sizes and long hard corridors.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

Architects working in Istanbul usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

What the buildings in Istanbul do to the specification

  • Built to move

    Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

  • Concrete blocks, live rooms

    The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.

  • A city that never goes quiet

    Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.

  • Turkey manufactures too

    Domestic supply exists, so we are worth importing where the specification, the colour consistency or the supply chain is the reason.

  • Assembly and performance rooms

    Mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.

04 / Room by room

Room by room, on a typical Istanbul job

  • Cinema hall with acoustic fabric wall system

    Screen to screen

    Independent construction between auditoria, with services broken at the line. Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

  • Felt acoustic panels in multiplex cinema

    In room response

    Heavy absorption on side and rear walls so the mix is heard as intended. The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.

  • Acoustic foams and bass traps in cinema hall

    Plant and projection

    Equipment noise into the auditorium, treated at source. Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Climate and durability

Durability in Istanbul, before acoustics is discussed

Istanbul is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

Where a consultant is already engaged on a Istanbul project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Read this first

What we watch go wrong on jobs like this

  • A shared service void running across the wall line

    A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.

  • Treating the auditorium to fix bleed from the next screen

    Small on the drawing, expensive on site, and almost always found after handover.

  • Doors and lobbies specified late and undersized

    Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.

  • Treating it as a generic Istanbul job

    Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

05 / Route to site

Supply into Istanbul, start to site

Supply into Istanbul
Ships fromPalwal, Haryana, India
Arrives atAmbarlı or Mersin, then road to site
Dispatch4 to 7 working days
FreightSea via Ambarlı
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Ambarlı or Mersin, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Istanbul projects

What makes cinema and multiplex soundproofing different in Istanbul?

Mosques, cultural centres and function halls are tall hard volumes carrying amplified speech. Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

Where should the budget go first on a Istanbul project?

Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.

Do you have an office or installation team in Istanbul?

No. We manufacture in India and supply into Istanbul. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Istanbul site?

ships from: Palwal, Haryana, India, arrives at: Ambarlı or Mersin, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.