We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Hyderabad. Hyderabad combines large IT campuses, a working film industry and a pharmaceutical manufacturing belt.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.
01 / Start here
What you are buying, and what it fixes in Hyderabad
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Hyderabad is mostly IT campuses, film and content studios, pharma plants, hospitals, schools, hotels.
RC frame apartments and gated communities with stone and tile floors, sharing slabs and lift cores.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Hyderabad.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification
The numbers, and they do not move by city
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
On a Hyderabad job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
03 / Local conditions
The Hyderabad conditions that change the answer
- A working film industry
Shooting floors, dubbing rooms and content spaces where the shell has to isolate before anything else is decided.
- Campus floors at scale
Large open plans with glass and hard flooring, repeated across many buildings. Consistency across the order is the value.
- Pharma and clean areas
Manufacturing plant next to controlled spaces, where mechanical noise is a design problem rather than a comfort one.
- Granite and hard ground
Buildings sit on rock, and rock transmits. Structure-borne noise from plant travels further here than people expect.
- Plant and HVAC
Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.
- The housing stock
RC frame apartments and gated communities with stone and tile floors, sharing slabs and lift cores.
We would rather argue about the build-up at design stage than on site. See how we support architects.
04 / Conditions
Why the climate in Hyderabad changes the material, not the target
Hyderabad is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The risk we design against here is mould, sagging fabric finishes and swelling in timber.
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
05 / Route to site
How material reaches a Hyderabad site
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | four days |
| Dispatch | 2 to 4 working days |
| To site | four days |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly fifteen hundred kilometres, normally four days on a dedicated truck.
06 / Read this first
Four honest warnings before you buy
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Square footage quoted before the room is understood
Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.
-
Suppliers who imply a Hyderabad presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
How it looks once it is installed
Hyderabad: questions we are actually asked
Is there a Hyderabad factory behind this product?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Hyderabad as the manufacturer rather than through a dealer. Hyderabad combines large IT campuses, a working film industry and a pharmaceutical manufacturing belt. You buy at factory prices with one consistent batch across the order.
What changes the specification on a Hyderabad job?
Large open plans with glass and hard flooring, repeated across many buildings. Consistency across the order is the value. Shooting floors, dubbing rooms and content spaces where the shell has to isolate before anything else is decided. Those two things move the build-up far more than the panel figure does.
Is this the right material for Hyderabad conditions?
Hyderabad is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.
How does an order actually travel to Hyderabad?
made at: Our own plant, Palwal, Haryana, reaches site in: four days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
What is the minimum order and how is it packed?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Send the drawings, get a straight answer