Manufactured in India, supplied in Germany
Soundproofing materials in Germany
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Germany. Made at our own plant in India, shipped in container loads to German sites, specified against your drawings before anything leaves the factory.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
This comes from our own plant, not a trading desk. We do not have an office in your city and we will not invent one. What we can give you is factory pricing, consistent material and a technical answer before you commit.
01 / The material
What this is, and what it changes in a Germany room
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Germany is mostly offices, studios, clubs, hotels, schools, clinics, industrial plant rooms.
Altbau blocks have solid masonry walls and timber joist floors, so airborne noise is controlled but footfall is not. Neubau is concrete with better floors and much harder surfaces.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Germany.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification
The numbers, and they do not move by city
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
On a Germany job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
03 / In this market
The Germany conditions that change the answer
- Two building stocks
Altbau apartments with timber floors pass noise between homes. Post-war concrete holds it in and rings. The same room needs a different answer depending on which one you are in.
- Specified acoustics
Most German jobs arrive with an acoustician already involved. Send us the target values and we will tell you which build-up gets there, and which one will not.
- Container quantities
Fit-outs across several floors or sites are cheaper by container. We quote full loads and stage deliveries against your programme.
- Winter build programmes
Sealed, insulated rooms sound dead in the wrong way. Absorption has to be balanced, not maximised, once the envelope is tight.
- Plant and HVAC
Mechanical ventilation with heat recovery is standard in newer stock, so duct-borne noise and terminal unit noise are the sources rather than open windows.
- The housing stock
Altbau blocks have solid masonry walls and timber joist floors, so airborne noise is controlled but footfall is not. Neubau is concrete with better floors and much harder surfaces.
For a Germany practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Climate
Why the climate in Germany changes the material, not the target
Germany is cool and damp, with long heating seasons and cold external walls, and that narrows the sensible material list before acoustics is even discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The risk we design against here is condensation behind linings in older, poorly insulated stock.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Getting it there
What the route into Germany actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Hamburg or Bremerhaven, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Hamburg |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order.
Sea freight into Hamburg or Bremerhaven, then road to site anywhere in Germany. Air freight for samples and urgent quantities.
06 / Straight talk
Where this goes wrong, said plainly
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Coverage bought instead of a target
Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.
-
Suppliers who imply a Germany presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
How it looks once it is installed
Germany: questions we are actually asked
Are these soundproofing materials made in Germany?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Germany as the manufacturer rather than through a dealer. Made at our own plant in India, shipped in container loads to German sites, specified against your drawings before anything leaves the factory. You buy at factory prices with one consistent batch across the order.
What decides the specification for a Germany project?
Altbau apartments with timber floors pass noise between homes. Post-war concrete holds it in and rings. The same room needs a different answer depending on which one you are in. Most German jobs arrive with an acoustician already involved. Send us the target values and we will tell you which build-up gets there, and which one will not. Those two things move the build-up far more than the panel figure does.
How does the Germany climate affect this product?
Germany is cool and damp, with long heating seasons and cold external walls. Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would. The failure we design against here is condensation behind linings in older, poorly insulated stock.
How does an order actually travel to Germany?
ships from: Palwal, Haryana, India, arrives at: Hamburg or Bremerhaven, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
How is the order packed and what is the minimum?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Tell us the room, we will tell you the build-up
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.