Soundproofing materials in Egypt

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Egypt. Made at our own plant in India and shipped into Alexandria, Port Said or Sokhna.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.

01 / Start here

The material, and what it actually does on a Egypt job

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Egypt is mostly new development and government buildings, hotels and resorts, offices, hospitals, schools, venues.

Reinforced concrete frames with block infill and hard tile floors, in blocks that sit close together with narrow light wells between them.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Egypt.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / The numbers

Published specification, identical wherever we ship it

These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

Where a consultant is already engaged on a Egypt project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

03 / On the ground

What we see driving Egypt briefs

  • Convenient sailings

    Our routes to Europe already pass this way, which keeps frequency good and freight competitive.

  • Development at scale

    Very large single orders where the same detail repeats across many buildings. Batch consistency matters more than the figure on one sheet.

  • Heat, dust and sealed buildings

    Closed up with heavy cooling, so plant noise accumulates inside and rooms stay hard and live.

  • Assembly and function spaces

    Large halls in concrete and stone where speech stops being intelligible well before the room sounds wrong.

  • Plant and HVAC

    Split units and generator sets, with condensers in light wells that channel noise back into every flat.

  • The housing stock

    Reinforced concrete frames with block infill and hard tile floors, in blocks that sit close together with narrow light wells between them.

We would rather argue about the build-up at design stage than on site. See how we support architects.

04 / Climate

What the Egypt climate rules in and rules out

Egypt is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the sensible material list before acoustics is even discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The risk we design against here is dust ingress and thermal movement in long runs.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

05 / Logistics

Getting it to Egypt, with real dates

Supply into Egypt
Ships fromPalwal, Haryana, India
Arrives atAlexandria, Port Said or Sokhna, then road to site
Dispatch4 to 7 working days
FreightSea via Alexandria or Port Said
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Alexandria, Port Said or Sokhna, then road to site. Air freight for samples and urgent quantities.

06 / Worth knowing

What we will tell you that a reseller will not

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • A number chased without a measurement

    If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.

  • A claim of being local to Egypt

    We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.

07 / In projects

The product on finished jobs

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Egypt: questions we are actually asked

Is there a Egypt factory behind this product?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Egypt as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Alexandria, Port Said or Sokhna. You buy at factory prices with one consistent batch across the order.

What changes the specification on a Egypt job?

Our routes to Europe already pass this way, which keeps frequency good and freight competitive. Very large single orders where the same detail repeats across many buildings. Batch consistency matters more than the figure on one sheet. Those two things move the build-up far more than the panel figure does.

Is this the right material for Egypt conditions?

Egypt is hot and dry for most of the year, with dust and high daytime surface temperatures. Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves. The failure we design against here is dust ingress and thermal movement in long runs.

When would material land on a Egypt site?

ships from: Palwal, Haryana, India, arrives at: Alexandria, Port Said or Sokhna, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

When are soundproofing materials the wrong purchase?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

What quantity do we have to order, and in what packaging?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send the drawings, get a straight answer