Manufactured in India, supplied in Denmark
Soundproofing materials in Denmark
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Denmark. Made at our own plant in India and shipped into Aarhus or Copenhagen, then a short road run to almost anywhere in the country.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.
01 / Start here
What you are buying, and what it fixes in Denmark
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Denmark is mostly apartments, offices, schools, healthcare, timber buildings, studios.
Masonry blocks with timber joist floors in older stock and concrete in newer, with hard surfaces and cold external walls throughout.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Denmark.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
The numbers, and they do not move by city
The specification below is the same everywhere we supply, because a specification that changed by city would not be a specification. What changes is which grade and build-up is the right buy, and that is what the rest of this page is about.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Where a consultant is already engaged on a Denmark project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
03 / On the ground
What decides the build-up in Denmark
- Timber and lightweight construction
Light structures pass low frequency easily, so mass and decoupling do the work rather than more absorption.
- Classes are written and verified
Work here arrives with a target and gets checked afterwards. Send us the class and we will say plainly what our material reaches and where it does not.
- Design led interiors
Finish matters as much as performance. Colour consistency across a full order is part of the job, not an afterthought.
- Sealed through a long winter
Buildings close up with ventilation running constantly, so plant noise matters more than street noise.
- Plant and HVAC
Balanced mechanical ventilation with heat recovery is standard, so duct and terminal noise replace open window noise.
- The housing stock
Masonry blocks with timber joist floors in older stock and concrete in newer, with hard surfaces and cold external walls throughout.
If you are specifying for a Denmark project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
04 / Durability
The Denmark climate decides the material list
Denmark is cool and damp, with long heating seasons and cold external walls, and that narrows the sensible material list before acoustics is even discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The risk we design against here is condensation behind linings in older, poorly insulated stock.
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
05 / Logistics
Getting it to Denmark, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Aarhus or Copenhagen, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Aarhus |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Aarhus or Copenhagen, then a short road run to site. Air freight for samples and urgent quantities.
06 / Before you buy
Where this goes wrong, said plainly
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Square footage quoted before the room is understood
Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.
-
Local approvals that nobody actually holds
We hold no Denmark certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.
07 / In projects
The product on finished jobs
Denmark: questions we are actually asked
Is there a Denmark factory behind this product?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Denmark as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Aarhus or Copenhagen, then a short road run to almost anywhere in the country. You buy at factory prices with one consistent batch across the order.
What changes the specification on a Denmark job?
Work here arrives with a target and gets checked afterwards. Send us the class and we will say plainly what our material reaches and where it does not. Finish matters as much as performance. Colour consistency across a full order is part of the job, not an afterthought. Those two things move the build-up far more than the panel figure does.
Is this the right material for Denmark conditions?
Denmark is cool and damp, with long heating seasons and cold external walls. Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would. The failure we design against here is condensation behind linings in older, poorly insulated stock.
How quickly can material reach a site in Denmark?
ships from: Palwal, Haryana, India, arrives at: Aarhus or Copenhagen, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
How is the order packed and what is the minimum?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Send a plan and a section, get a real build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.