Home > Chile > Cinema and multiplex soundproofing

Premium multiplex cinema auditorium with acoustic treatment

For projects in Chile

Cinema and multiplex soundproofing in Chile

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Church buildings, theatres and event halls are hard volumes with long decay times.

Screen to screen
Independent construction between auditoria, with services broken at the line.
In room response
Heavy absorption on side and rear walls so the mix is heard as intended.
Plant and projection
Equipment noise into the auditorium, treated at source.
Quote
From a plan and a section, within 48 hours

01 / The product

What you are buying, and what it fixes in Chile

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.

Church buildings, theatres and event halls are hard volumes with long decay times.

Work reaching us from Chile is mostly offices, apartments, mining and industrial facilities, hotels, hospitals, schools.

  • Seismic detailing comes first Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.
  • Mining and industrial plant Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work.
  • A very long country Site location changes the inland leg dramatically. We quote the road leg for your actual destination rather than an average.
  • Screen to screen Independent construction between auditoria, with services broken at the line.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Chile.

Multiplex and cinema soundproofing

02 / The build-up

The build-up, layer by layer

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Chile, split units and central plant with condensers on facades and rooftops close to bedrooms.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Chile, church buildings, theatres and event halls are hard volumes with long decay times.

    Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.

  3. PET acoustic felt wall panels in office interior

    Layer 3

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Chile, school buildings are hard surfaced with long corridors and gymnasiums doubling as assembly halls.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / In this market

What decides the build-up in Chile

  • Seismic detailing comes first

    Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.

  • Mining and industrial plant

    Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work.

  • A very long country

    Site location changes the inland leg dramatically. We quote the road leg for your actual destination rather than an average.

  • Dry in the north, wet in the south

    PET felt is stable in both. It does not absorb moisture or degrade in dry heat, which simplifies specifying across regions.

  • Assembly and performance rooms

    Church buildings, theatres and event halls are hard volumes with long decay times.

04 / Room by room

Space by space, for Chile briefs

  • Cinema hall with acoustic fabric wall system

    Screen to screen

    Independent construction between auditoria, with services broken at the line. Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.

  • Felt acoustic panels in multiplex cinema

    In room response

    Heavy absorption on side and rear walls so the mix is heard as intended. Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work.

  • Acoustic foams and bass traps in cinema hall

    Plant and projection

    Equipment noise into the auditorium, treated at source. Site location changes the inland leg dramatically. We quote the road leg for your actual destination rather than an average.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Climate

What the Chile climate rules in and rules out

Chile is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Worth knowing

Six mistakes that turn into a second fit-out

  • A shared service void running across the wall line

    The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.

  • Treating the auditorium to fix bleed from the next screen

    This is the one that comes back as a second fit-out rather than a snag.

  • Doors and lobbies specified late and undersized

    Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.

  • Treating it as a generic Chile job

    Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.

05 / Logistics

Getting it to Chile, with real dates

Supply into Chile
Ships fromPalwal, Haryana, India
Arrives atSan Antonio or Valparaíso, then road to site
Dispatch4 to 7 working days
FreightSea via San Antonio
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into San Antonio or Valparaíso, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Chile projects

What makes cinema and multiplex soundproofing different in Chile?

Church buildings, theatres and event halls are hard volumes with long decay times. Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.

Where should the budget go first on a Chile project?

Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.

Do you have an office or installation team in Chile?

No. We manufacture in India and supply into Chile. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Chile site?

ships from: Palwal, Haryana, India, arrives at: San Antonio or Valparaíso, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.