Home > Chicago > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in Chicago

Recording studio acoustics and soundproofing in Chicago

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. Home and project studios go into basements and converted garages with equipment budgets far ahead of the building. The room leaks to the floor above long before it sounds wrong inside.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / Start here

What you are buying, and what it fixes in Chicago

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

Home and project studios go into basements and converted garages with equipment budgets far ahead of the building. The room leaks to the floor above long before it sounds wrong inside.

Work reaching us from Chicago is mostly two-flats and three-flats, high-rise apartments, offices, venues, schools, clinics.

  • Brick outside, timber inside Two-flats and three-flats have solid masonry outside and timber floors between families. Footfall travels down and masonry does nothing about it.
  • Elevated rail past the window Trains at window height put noise in through the glazing, not through the wall. The facade is where the money should go first.
  • No port, so plan the inland leg Everything arrives at a coast and rails in. We quote the sea leg and the inland leg separately.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Chicago.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

How the layers stack, from the structure inwards

  1. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 1

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Chicago, packaged rooftop units and ducted forced air are standard, so noise arrives through the duct rather than through the wall. Lining the first three metres of duct and treating the return path is usually the whole job.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  2. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 2

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Chicago, churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

  3. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 3

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Chicago, public school buildings run long corridors with hard floors and lay-in tile ceilings that were chosen for cost, not for speech. Classroom reverberation and corridor spill are the two complaints, and both respond to ceiling area rather than wall panels.

    Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / On the ground

What the buildings in Chicago do to the specification

  • Brick outside, timber inside

    Two-flats and three-flats have solid masonry outside and timber floors between families. Footfall travels down and masonry does nothing about it.

  • Elevated rail past the window

    Trains at window height put noise in through the glazing, not through the wall. The facade is where the money should go first.

  • No port, so plan the inland leg

    Everything arrives at a coast and rails in. We quote the sea leg and the inland leg separately.

  • Sealed against hard winters

    Buildings close up for months and mechanical systems run hard, so sound accumulates inside rather than escaping.

  • The housing stock

    American homes are timber frame with gypsum board on both faces, so a party wall or a basement ceiling has almost no mass. Adding a second leaf with a limp membrane between does more than any amount of surface treatment.

  • The studio and content scene

    Home and project studios go into basements and converted garages with equipment budgets far ahead of the building. The room leaks to the floor above long before it sounds wrong inside.

04 / Room by room

Where the money goes on a Chicago project

  • Recording studio soundproof wall system

    Isolation

    A measured background level, agreed before anything is bought. Two-flats and three-flats have solid masonry outside and timber floors between families. Footfall travels down and masonry does nothing about it.

  • Acoustic foam and panels in a recording studio

    Low frequency

    Corner and boundary absorption with real depth, not surface foam. Trains at window height put noise in through the glazing, not through the wall. The facade is where the money should go first.

  • Studio door and control room window

    Early reflections

    Controlled at the mix position, and only there. Everything arrives at a coast and rails in. We quote the sea leg and the inland leg separately.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Durability

What the Chicago climate rules in and rules out

Chicago is mild summers and cold, wet winters, and that narrows the material list before acoustics is discussed.

Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.

The failure we design against here is condensation and cold bridging behind new linings.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Read this first

What we watch go wrong on jobs like this

  • Buying foam to solve an isolation problem

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating the room before the shell is isolated

    Small on the drawing, expensive on site, and almost always found after handover.

  • Killing the room completely and calling it controlled

    A room can be over-treated. Past the target it stops sounding controlled and starts sounding dead, and you paid for that.

  • Treating it as a generic Chicago job

    Two-flats and three-flats have solid masonry outside and timber floors between families. Footfall travels down and masonry does nothing about it.

05 / Getting it there

How material reaches a Chicago site

Supply into Chicago
Ships fromPalwal, Haryana, India
Arrives atAn East or Gulf coast port, then rail and road inland
Dispatch4 to 7 working days
FreightSea, then rail inland
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into an East or Gulf coast port, then rail and road to Chicago. Air freight for samples and urgent quantities.

FAQ

Questions from Chicago projects

What makes recording studio acoustics and soundproofing different in Chicago?

Home and project studios go into basements and converted garages with equipment budgets far ahead of the building. The room leaks to the floor above long before it sounds wrong inside. Trains at window height put noise in through the glazing, not through the wall. The facade is where the money should go first.

Where should the budget go first on a Chicago project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Chicago?

No. We manufacture in India and supply into Chicago. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Chicago site?

ships from: Palwal, Haryana, India, arrives at: An East or Gulf coast port, then rail and road inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.