For projects in Brazil
Venue and restaurant acoustics in Brazil
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The material, and what it actually does on a Brazil job
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
Work reaching us from Brazil is mostly offices and corporate towers, apartments, hotels, schools, hospitals, studios.
- Concrete and block, hard inside The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
- Impact through slabs Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
- A long sea leg and a real import process Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Brazil.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
The build-up, layer by layer
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Brazil, split units and VRF, with condensers in light wells and on facades close to bedrooms.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
-

Layer 2
Wooden slat acoustic panels
Timber slats on an acoustic backing. In Brazil, churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
Slats on a cavity. Backing plus an air gap behind moves absorption lower, which matters in music rooms.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Brazil, classrooms are concrete and tile with high ceilings and hard floors, and covered play areas amplify everything.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / In this market
What the buildings in Brazil do to the specification
- Concrete and block, hard inside
The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
- Impact through slabs
Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
- A long sea leg and a real import process
Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
- Humid in most of the country
PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag within a few seasons.
- Assembly and performance rooms
Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
04 / Room by room
Space by space, for Brazil briefs
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Acoustic carpet and rugs, High density polyester
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Acoustic carpet and rugs, Felt
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- Acoustic carpet and rugs, 64 sq ft per pack
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Climate and durability
Durability in Brazil, before acoustics is discussed
Brazil is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Worth knowing
What we watch go wrong on jobs like this
-
Panels on the wall as a neighbour noise solution
Small on the drawing, expensive on site, and almost always found after handover.
-
A lobby with both doors able to open at once
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Extract ducting that bypasses every wall you built
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Treating it as a generic Brazil job
The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
05 / Logistics
What the route into Brazil actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Santos or Paranaguá, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Santos |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Santos or Paranaguá, then road to site. Air freight for samples and urgent quantities.
Questions from Brazil projects
What makes venue and restaurant acoustics different in Brazil?
Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level. The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
Where should the budget go first on a Brazil project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Brazil?
No. We manufacture in India and supply into Brazil. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Brazil site?
ships from: Palwal, Haryana, India, arrives at: Santos or Paranaguá, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.