Home > Bhutan > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Bhutan

Soundproofing materials in Bhutan

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Bhutan. Made at our own plant in India and moved overland through Phuentsholing, so Bhutan is one of the few markets we reach entirely by road with no port at all.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.

01 / The material

What this material is and where it earns its place in Bhutan

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Bhutan is mostly hotels and resorts, institutional buildings, assembly halls, schools, clinics, offices.

Concrete frame with block infill and traditional timber detailing, with hard floors and cold external walls.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Bhutan.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Data sheet

The published figures, unchanged by location

The specification below is the same everywhere we supply, because a specification that changed by city would not be a specification. What changes is which grade and build-up is the right buy, and that is what the rest of this page is about.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

03 / Local conditions

The Bhutan conditions that change the answer

  • Traditional construction

    Timber framing, rammed earth and masonry in buildings that must keep their character. Work has to be internal and respectful of the fabric.

  • No port, no container handling

    Entirely by road from our plant. Lead times are short and a small consignment is genuinely economic.

  • Seismic and mountainous

    Structures are built to move and the final road leg is steep and rough. We brace and wrap for both.

  • Hospitality at altitude

    Hotels and lodges where guest room isolation matters more than anything happening inside the room itself.

  • Plant and HVAC

    Electric heating and split units, with plant close to occupied rooms in compact buildings.

  • The housing stock

    Concrete frame with block infill and traditional timber detailing, with hard floors and cold external walls.

For a Bhutan practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

04 / Climate

Durability in Bhutan, before acoustics is discussed

Bhutan is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The risk we design against here is wet-season humidity behind linings.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

05 / Supply

How material reaches a Bhutan site

Supply into Bhutan
Ships fromPalwal, Haryana, India
Arrives atOverland through Phuentsholing, then road to site
Dispatch4 to 7 working days
FreightRoad via the India border
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Overland by road through the India border, then on to site. No sea leg and no port handling.

06 / Read this first

What we will tell you that a reseller will not

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • Coverage bought instead of a target

    Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.

  • Suppliers who imply a Bhutan presence

    Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.

07 / In projects

In finished rooms

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Bhutan: questions we are actually asked

Do you manufacture soundproofing materials in Bhutan?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Bhutan as the manufacturer rather than through a dealer. Made at our own plant in India and moved overland through Phuentsholing, so Bhutan is one of the few markets we reach entirely by road with no port at all. You buy at factory prices with one consistent batch across the order.

What decides the specification for a Bhutan project?

Entirely by road from our plant. Lead times are short and a small consignment is genuinely economic. Timber framing, rammed earth and masonry in buildings that must keep their character. Work has to be internal and respectful of the fabric. Those two things move the build-up far more than the panel figure does.

Is this the right material for Bhutan conditions?

Bhutan is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.

How does an order actually travel to Bhutan?

ships from: Palwal, Haryana, India, arrives at: Overland through Phuentsholing, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Where do soundproofing materials fail to help?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

How is the order packed and what is the minimum?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.