For projects in Barcelona
Cinema and multiplex soundproofing in Barcelona
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
The product, described honestly, for a Barcelona brief
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.
Work reaching us from Barcelona is mostly eixample apartments, hotels and short lets, restaurants, offices, clinics, studios.
- Eixample blocks share everything Flats stacked around an interior courtyard with tiled floors and hard plaster. Sound moves between homes through the structure and across the patio.
- Tourism conversions Apartments turned into short lets put beds either side of walls that were never separating walls. Doors and corridors cause most complaints.
- Late streets Venues and terraces operate late underneath homes, so containment decides how long they trade.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Barcelona.
02 / The build-up
The build-up, layer by layer
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Barcelona, split and multi-split systems dominate, with condensers in patios and light wells that act as reverberant shafts.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Barcelona, churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.
Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Barcelona, school buildings are concrete and tile with high ceilings and hard floors, and dining halls are the loudest rooms in the building.
On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.
If you are specifying for a Barcelona project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What the buildings in Barcelona do to the specification
- Eixample blocks share everything
Flats stacked around an interior courtyard with tiled floors and hard plaster. Sound moves between homes through the structure and across the patio.
- Tourism conversions
Apartments turned into short lets put beds either side of walls that were never separating walls. Doors and corridors cause most complaints.
- Late streets
Venues and terraces operate late underneath homes, so containment decides how long they trade.
- The port is at the city
Direct sea into Barcelona keeps the road leg short and the landed cost predictable.
- Assembly and performance rooms
Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.
04 / Room by room
Where the money goes on a Barcelona project
-

Screen to screen
Independent construction between auditoria, with services broken at the line. Flats stacked around an interior courtyard with tiled floors and hard plaster. Sound moves between homes through the structure and across the patio.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Apartments turned into short lets put beds either side of walls that were never separating walls. Doors and corridors cause most complaints.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
-

Plant and projection
Equipment noise into the auditorium, treated at source. Venues and terraces operate late underneath homes, so containment decides how long they trade.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
For a Barcelona interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Durability
What the Barcelona climate rules in and rules out
Barcelona is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.
The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.
The failure we design against here is seasonal movement in timber and winter damp in unheated stock.
Where a consultant is already engaged on a Barcelona project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Before you buy
Six mistakes that turn into a second fit-out
-
A shared service void running across the wall line
A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.
-
Treating the auditorium to fix bleed from the next screen
This is the one that comes back as a second fit-out rather than a snag.
-
Doors and lobbies specified late and undersized
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Treating it as a generic Barcelona job
Flats stacked around an interior courtyard with tiled floors and hard plaster. Sound moves between homes through the structure and across the patio.
05 / Supply
What the route into Barcelona actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Barcelona, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Barcelona |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight direct into Barcelona, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Barcelona projects
What makes cinema and multiplex soundproofing different in Barcelona?
Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times. Flats stacked around an interior courtyard with tiled floors and hard plaster. Sound moves between homes through the structure and across the patio.
Where should the budget go first on a Barcelona project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Barcelona?
No. We manufacture in India and supply into Barcelona. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Barcelona site?
ships from: Palwal, Haryana, India, arrives at: Barcelona, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.