Home > Barcelona > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Barcelona

HVAC, plant and machine noise control in Barcelona

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split and multi-split systems dominate, with condensers in patios and light wells that act as reverberant shafts.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / The product

What this material is and where it earns its place in Barcelona

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split and multi-split systems dominate, with condensers in patios and light wells that act as reverberant shafts.

Work reaching us from Barcelona is mostly eixample apartments, hotels and short lets, restaurants, offices, clinics, studios.

  • Eixample blocks share everything Flats stacked around an interior courtyard with tiled floors and hard plaster. Sound moves between homes through the structure and across the patio.
  • Tourism conversions Apartments turned into short lets put beds either side of walls that were never separating walls. Doors and corridors cause most complaints.
  • Late streets Venues and terraces operate late underneath homes, so containment decides how long they trade.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Barcelona.

HVAC duct soundproofing Machine noise control

02 / The build-up

What goes where, from the structure in

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Barcelona, split and multi-split systems dominate, with condensers in patios and light wells that act as reverberant shafts.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

  2. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 2

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Barcelona, churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.

    Direct fix. Mechanically fixed to the soffit or wall. Durable and simple.

  3. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 3

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Barcelona, school buildings are concrete and tile with high ceilings and hard floors, and dining halls are the loudest rooms in the building.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

For a Barcelona practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / Local conditions

What the buildings in Barcelona do to the specification

  • Eixample blocks share everything

    Flats stacked around an interior courtyard with tiled floors and hard plaster. Sound moves between homes through the structure and across the patio.

  • Tourism conversions

    Apartments turned into short lets put beds either side of walls that were never separating walls. Doors and corridors cause most complaints.

  • Late streets

    Venues and terraces operate late underneath homes, so containment decides how long they trade.

  • The port is at the city

    Direct sea into Barcelona keeps the road leg short and the landed cost predictable.

  • Plant and HVAC

    Split and multi-split systems dominate, with condensers in patios and light wells that act as reverberant shafts.

04 / Room by room

What each space in a Barcelona project needs

For a Barcelona interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Conditions

What the Barcelona climate rules in and rules out

Barcelona is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

Where a consultant is already engaged on a Barcelona project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Worth knowing

Six mistakes that turn into a second fit-out

  • Absorption on the office wall for a plant room problem

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Ignoring structure borne vibration through the mounts

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic Barcelona job

    Flats stacked around an interior courtyard with tiled floors and hard plaster. Sound moves between homes through the structure and across the patio.

05 / Getting it there

How material reaches a Barcelona site

Supply into Barcelona
Ships fromPalwal, Haryana, India
Arrives atBarcelona, then a short road run to site
Dispatch4 to 7 working days
FreightSea into Barcelona
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight direct into Barcelona, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Barcelona projects

What makes HVAC, plant and machine noise control different in Barcelona?

Split and multi-split systems dominate, with condensers in patios and light wells that act as reverberant shafts. Flats stacked around an interior courtyard with tiled floors and hard plaster. Sound moves between homes through the structure and across the patio.

Where should the budget go first on a Barcelona project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Barcelona?

No. We manufacture in India and supply into Barcelona. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Barcelona site?

ships from: Palwal, Haryana, India, arrives at: Barcelona, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.