Home > Bali > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Bali

Soundproofing materials in Bali

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Bali. Made at our own plant in India and shipped into Surabaya or Benoa, then road or inter-island onward to site.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.

01 / Start here

The product, described honestly, for a Bali brief

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Bali is mostly resorts and villas, beach clubs and restaurants, spas, offices, guest rooms.

Concrete frame with block infill in cities, timber and light construction outside them. Apartment stock shares walls and slabs that were never detailed for two households.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Bali.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Specification sheet

One specification sheet, the same in every market

These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

On a Bali job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

03 / In this market

What decides the build-up in Bali

  • Buildings that are only partly enclosed

    Open pavilions and sliding walls mean there is often no envelope to isolate. The honest answer is treating what is there and telling you what cannot be fixed.

  • Beach clubs and neighbours

    Late trading venues beside villas and other resorts, where containment of low frequency is what keeps the operation on good terms.

  • Humidity and salt destroy the wrong material

    PET felt does not absorb moisture, rot or feed mould. Mineral products sag here within a single season.

  • An onward leg to the island

    Material arrives and then continues by road or ferry. Tell us and we pack for the second journey.

  • Plant and HVAC

    Split units everywhere, with condensers on balconies and light wells that channel noise straight back into bedrooms.

  • The housing stock

    Concrete frame with block infill in cities, timber and light construction outside them. Apartment stock shares walls and slabs that were never detailed for two households.

We would rather argue about the build-up at design stage than on site. See how we support architects.

04 / Climate

Why the climate in Bali changes the material, not the target

Bali is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The risk we design against here is mould, sagging fabric finishes and swelling in timber.

For a Bali interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

05 / Supply

Getting it to Bali, with real dates

Supply into Bali
Ships fromPalwal, Haryana, India
Arrives atSurabaya or Benoa, then road to site
Dispatch4 to 7 working days
FreightSea via Surabaya or Benoa
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Surabaya or Benoa, then road or ferry onward to site. Air freight for samples.

06 / Before you buy

Four honest warnings before you buy

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • Coverage bought instead of a target

    Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.

  • Local approvals that nobody actually holds

    We hold no Bali certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.

07 / In projects

In finished rooms

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Bali: questions we are actually asked

Is there a Bali factory behind this product?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Bali as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Surabaya or Benoa, then road or inter-island onward to site. You buy at factory prices with one consistent batch across the order.

What changes the specification on a Bali job?

Open pavilions and sliding walls mean there is often no envelope to isolate. The honest answer is treating what is there and telling you what cannot be fixed. Late trading venues beside villas and other resorts, where containment of low frequency is what keeps the operation on good terms. Those two things move the build-up far more than the panel figure does.

Will this material last in the Bali climate?

Bali is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.

What is the delivery time into Bali?

ships from: Palwal, Haryana, India, arrives at: Surabaya or Benoa, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

When are soundproofing materials the wrong purchase?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

Is there a minimum order, and how does it arrive?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send the drawings, get a straight answer

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.