Home > Argentina > Office acoustics and soundproofing

Modern office interior with acoustic treatment

For projects in Argentina

Office acoustics and soundproofing in Argentina

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Split units with condensers in light wells and on facades close to bedrooms.

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Meeting rooms
Privacy between rooms. That is partition and door work, not panels.
Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber.
Quote
From a plan and a section, within 48 hours

01 / The product

What you are buying, and what it fixes in Argentina

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.

Split units with condensers in light wells and on facades close to bedrooms.

Work reaching us from Argentina is mostly apartments and conversions, offices, restaurants, hotels, schools, clinics, studios.

  • Paperwork is part of the lead time Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.
  • European style building stock Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.
  • Conversions of older buildings The structure usually stays, so build-ups have to be shallow and work within existing finishes.
  • Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Argentina.

Office and conference room acoustics Acoustic office screens

02 / The build-up

The stack, in the order it is installed

  1. Acoustic hanging ceiling baffles in a large open space

    Layer 1

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Argentina, split units with condensers in light wells and on facades close to bedrooms.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

  2. PET acoustic felt wall panels in office interior

    Layer 2

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Argentina, theatres, church buildings and event halls are hard volumes with long decay times.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

  3. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 3

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Argentina, school buildings are hard surfaced with high ceilings and long corridors that carry every sound.

    Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.

Architects working in Argentina usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

What the buildings in Argentina do to the specification

  • Paperwork is part of the lead time

    Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.

  • European style building stock

    Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.

  • Conversions of older buildings

    The structure usually stays, so build-ups have to be shallow and work within existing finishes.

  • A long sea leg

    This is one of our longest routes. Ordering to a real schedule matters, so we quote the full window.

  • Plant and HVAC

    Split units with condensers in light wells and on facades close to bedrooms.

04 / Room by room

Where the money goes on a Argentina project

  • Office ceiling with acoustic clouds and baffles

    Open plan

    Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.

  • Acoustic wall panels in office

    Meeting rooms

    Privacy between rooms. That is partition and door work, not panels. Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.

  • Office acoustic carpet tiles and rugs

    Cabins and calls

    Short RT so a call sounds clean. A small amount of well placed absorber. The structure usually stays, so build-ups have to be shallow and work within existing finishes.

For a Argentina interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate

Durability in Argentina, before acoustics is discussed

Argentina is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

On a Argentina job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Worth knowing

Where this kind of project usually fails

  • Lining every wall while leaving the ceiling bare

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating a privacy problem with absorption

    Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.

  • Glass cabins specified without a door and head detail

    Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.

  • Treating it as a generic Argentina job

    Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.

05 / Route to site

Getting it to Argentina, with real dates

Supply into Argentina
Ships fromPalwal, Haryana, India
Arrives atBuenos Aires, then road to site
Dispatch4 to 7 working days
FreightSea via Buenos Aires
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Buenos Aires, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Argentina projects

What makes office acoustics and soundproofing different in Argentina?

Split units with condensers in light wells and on facades close to bedrooms. Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.

Where should the budget go first on a Argentina project?

Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.

Do you have an office or installation team in Argentina?

No. We manufacture in India and supply into Argentina. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Argentina site?

ships from: Palwal, Haryana, India, arrives at: Buenos Aires, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.