For projects in Argentina
Office acoustics and soundproofing in Argentina
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Split units with condensers in light wells and on facades close to bedrooms.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What you are buying, and what it fixes in Argentina
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Split units with condensers in light wells and on facades close to bedrooms.
Work reaching us from Argentina is mostly apartments and conversions, offices, restaurants, hotels, schools, clinics, studios.
- Paperwork is part of the lead time Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.
- European style building stock Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.
- Conversions of older buildings The structure usually stays, so build-ups have to be shallow and work within existing finishes.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Argentina.
Office and conference room acoustics Acoustic office screens
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Argentina, split units with condensers in light wells and on facades close to bedrooms.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Argentina, theatres, church buildings and event halls are hard volumes with long decay times.
On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Argentina, school buildings are hard surfaced with high ceilings and long corridors that carry every sound.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
Architects working in Argentina usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / In this market
What the buildings in Argentina do to the specification
- Paperwork is part of the lead time
Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.
- European style building stock
Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.
- Conversions of older buildings
The structure usually stays, so build-ups have to be shallow and work within existing finishes.
- A long sea leg
This is one of our longest routes. Ordering to a real schedule matters, so we quote the full window.
- Plant and HVAC
Split units with condensers in light wells and on facades close to bedrooms.
04 / Room by room
Where the money goes on a Argentina project
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.
- Acoustic carpet and rugs, 500 x 500 mm
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.
- Acoustic carpet and rugs, 4 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. The structure usually stays, so build-ups have to be shallow and work within existing finishes.
- Acoustic carpet and rugs, High density polyester
- Acoustic panels, ASTM C423
- SoundBlanket mass loaded vinyl, 5 x 1.2 m, 6 sq m per roll
For a Argentina interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate
Durability in Argentina, before acoustics is discussed
Argentina is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
On a Argentina job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Worth knowing
Where this kind of project usually fails
-
Lining every wall while leaving the ceiling bare
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating a privacy problem with absorption
Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.
-
Glass cabins specified without a door and head detail
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Argentina job
Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.
05 / Route to site
Getting it to Argentina, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Buenos Aires, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Buenos Aires |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Buenos Aires, then road to site. Air freight for samples and urgent quantities.
Questions from Argentina projects
What makes office acoustics and soundproofing different in Argentina?
Split units with condensers in light wells and on facades close to bedrooms. Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.
Where should the budget go first on a Argentina project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in Argentina?
No. We manufacture in India and supply into Argentina. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Argentina site?
ships from: Palwal, Haryana, India, arrives at: Buenos Aires, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.