Home > Argentina > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in Argentina

Recording studio acoustics and soundproofing in Argentina

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A deep music, dubbing and production culture working inside apartment blocks and converted buildings.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / The material

What you are buying, and what it fixes in Argentina

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

A deep music, dubbing and production culture working inside apartment blocks and converted buildings.

Work reaching us from Argentina is mostly apartments and conversions, offices, restaurants, hotels, schools, clinics, studios.

  • European style building stock Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.
  • Paperwork is part of the lead time Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.
  • Conversions of older buildings The structure usually stays, so build-ups have to be shallow and work within existing finishes.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Argentina.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

The stack, in the order it is installed

  1. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 1

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Argentina, split units with condensers in light wells and on facades close to bedrooms.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  2. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 2

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Argentina, theatres, church buildings and event halls are hard volumes with long decay times.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  3. ...

    Layer 3

    Soundproof curtains

    A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Argentina, school buildings are hard surfaced with high ceilings and long corridors that carry every sound.

    Full height with return. Curtain taken floor to soffit with a side return and an overlap, because the gap is what leaks, not the fabric.

Architects working in Argentina usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / Local conditions

What decides the build-up in Argentina

  • European style building stock

    Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.

  • Paperwork is part of the lead time

    Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.

  • Conversions of older buildings

    The structure usually stays, so build-ups have to be shallow and work within existing finishes.

  • A long sea leg

    This is one of our longest routes. Ordering to a real schedule matters, so we quote the full window.

  • The housing stock

    Masonry and concrete blocks with hard floors and internal light wells that carry sound between flats.

  • The studio and content scene

    A deep music, dubbing and production culture working inside apartment blocks and converted buildings.

04 / Room by room

Room by room, on a typical Argentina job

  • Recording studio soundproof wall system

    Isolation

    A measured background level, agreed before anything is bought. Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.

  • Acoustic foam and panels in a recording studio

    Low frequency

    Corner and boundary absorption with real depth, not surface foam. Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.

  • Studio door and control room window

    Early reflections

    Controlled at the mix position, and only there. The structure usually stays, so build-ups have to be shallow and work within existing finishes.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

Why the climate in Argentina changes the material, not the target

Argentina is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Straight talk

The six errors that cost the most

  • Buying foam to solve an isolation problem

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating the room before the shell is isolated

    Small on the drawing, expensive on site, and almost always found after handover.

  • Killing the room completely and calling it controlled

    More absorption is not better absorption. Past the target the room goes flat and people raise their voices to compensate.

  • Treating it as a generic Argentina job

    Tall rooms with hard plaster and timber floors between apartments. Footfall travels down, and the rooms hold sound for a long time.

05 / Logistics

What the route into Argentina actually looks like

Supply into Argentina
Ships fromPalwal, Haryana, India
Arrives atBuenos Aires, then road to site
Dispatch4 to 7 working days
FreightSea via Buenos Aires
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Buenos Aires, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Argentina projects

What makes recording studio acoustics and soundproofing different in Argentina?

A deep music, dubbing and production culture working inside apartment blocks and converted buildings. Import formalities take time here and pretending otherwise helps nobody. We prepare the documentation package before shipping rather than after.

Where should the budget go first on a Argentina project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Argentina?

No. We manufacture in India and supply into Argentina. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Argentina site?

ships from: Palwal, Haryana, India, arrives at: Buenos Aires, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.