For projects in Al Khobar
Cinema and multiplex soundproofing in Al Khobar
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What you are buying, and what it fixes in Al Khobar
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Work reaching us from Al Khobar is mostly control rooms and plant, corporate offices, compound housing, hotels, clinics, schools.
- Industrial noise is a different problem Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch that. Mass, isolation and sealing will.
- Control rooms and operations centres People sit in these rooms for twelve hours listening to alarms and radios. Intelligibility matters more than a reverberation figure on a sheet.
- Port on the doorstep Dammam is close, so the road leg is short and the landed cost is predictable. That is the practical reason a factory in India can serve this market on schedule.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Al Khobar.
02 / The build-up
The build-up, layer by layer
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Al Khobar, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Al Khobar, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Al Khobar, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.
Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
If you are specifying for a Al Khobar project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / On the ground
The Al Khobar conditions that change the answer
- Industrial noise is a different problem
Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch that. Mass, isolation and sealing will.
- Control rooms and operations centres
People sit in these rooms for twelve hours listening to alarms and radios. Intelligibility matters more than a reverberation figure on a sheet.
- Port on the doorstep
Dammam is close, so the road leg is short and the landed cost is predictable. That is the practical reason a factory in India can serve this market on schedule.
- Heat, dust and sealed buildings
Buildings stay closed with heavy cooling running year round. Plant noise has nowhere to escape, and rooms get hard and live inside.
- Assembly and performance rooms
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
04 / Room by room
Space by space, for Al Khobar briefs
-

Screen to screen
Independent construction between auditoria, with services broken at the line. Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch that. Mass, isolation and sealing will.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. People sit in these rooms for twelve hours listening to alarms and radios. Intelligibility matters more than a reverberation figure on a sheet.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
-

Plant and projection
Equipment noise into the auditorium, treated at source. Dammam is close, so the road leg is short and the landed cost is predictable. That is the practical reason a factory in India can serve this market on schedule.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate and durability
Durability in Al Khobar, before acoustics is discussed
Al Khobar is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Read this first
Six mistakes that turn into a second fit-out
-
A shared service void running across the wall line
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating the auditorium to fix bleed from the next screen
This is the one that comes back as a second fit-out rather than a snag.
-
Doors and lobbies specified late and undersized
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Al Khobar job
Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch that. Mass, isolation and sealing will.
05 / Route to site
What the route into Al Khobar actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Dammam, then a short road run across the Eastern Province |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Dammam |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
Sea freight into Dammam, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Al Khobar projects
What makes cinema and multiplex soundproofing different in Al Khobar?
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief. Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch that. Mass, isolation and sealing will.
Where should the budget go first on a Al Khobar project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Al Khobar?
No. We manufacture in India and supply into Al Khobar. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Al Khobar site?
ships from: Palwal, Haryana, India, arrives at: Dammam, then a short road run across the Eastern Province, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.