Home > Abu Dhabi > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Abu Dhabi

Soundproofing materials in Abu Dhabi

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Abu Dhabi. Made at our own plant in India and shipped into Khalifa Port or Jebel Ali.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.

01 / Start here

What this material is and where it earns its place in Abu Dhabi

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Abu Dhabi is mostly hotels, cultural and institutional buildings, villas, offices, clinics, schools, studios.

Towers and villas are concrete and block with stone or porcelain floors throughout. Mass is not the problem, impact noise and live rooms are.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Abu Dhabi.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Specification sheet

The numbers, and they do not move by city

The specification below is the same everywhere we supply, because a specification that changed by city would not be a specification. What changes is which grade and build-up is the right buy, and that is what the rest of this page is about.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

Where a consultant is already engaged on a Abu Dhabi project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

03 / In this market

What the buildings in Abu Dhabi do to the specification

  • Short sea leg from India

    Western Indian ports to the UAE is a short run. That is the practical reason a factory in India can hold an Abu Dhabi programme date, and it is why we quote sea rather than air for most orders.

  • Concrete and glass, sealed all year

    Blockwork and full glazing with the building closed up against the heat gives a hard, live interior and a lot of mechanical noise with nowhere to go.

  • Submittals and samples

    Most work here goes through a consultant. Send us the specification and we will tell you where our material sits against it and where it does not, in writing.

  • MEP noise is the quiet problem

    Heavy cooling loads mean large plant close to occupied space. Ducts, risers and plant rooms cause more complaints than anything in the room itself.

  • Plant and HVAC

    District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.

  • The housing stock

    Towers and villas are concrete and block with stone or porcelain floors throughout. Mass is not the problem, impact noise and live rooms are.

We would rather argue about the build-up at design stage than on site. See how we support architects.

04 / Conditions

What the Abu Dhabi climate rules in and rules out

Abu Dhabi is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the sensible material list before acoustics is even discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The risk we design against here is dust ingress and thermal movement in long runs.

For a Abu Dhabi interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

05 / Route to site

Supply into Abu Dhabi, start to site

Supply into Abu Dhabi
Ships fromPalwal, Haryana, India
Arrives atKhalifa Port or Jebel Ali, then road to site
Dispatch4 to 7 working days
FreightSea via Khalifa Port
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

Sea freight into Khalifa Port or Jebel Ali, then road to site. The short transit means sea works for most programmes. Air freight for samples and urgent quantities.

06 / Straight talk

What we will tell you that a reseller will not

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • A number chased without a measurement

    If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.

  • Suppliers who imply a Abu Dhabi presence

    Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.

07 / In projects

How it looks once it is installed

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Abu Dhabi: questions we are actually asked

Is there a Abu Dhabi factory behind this product?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Abu Dhabi as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Khalifa Port or Jebel Ali. You buy at factory prices with one consistent batch across the order.

What changes the specification on a Abu Dhabi job?

Western Indian ports to the UAE is a short run. That is the practical reason a factory in India can hold an Abu Dhabi programme date, and it is why we quote sea rather than air for most orders. Blockwork and full glazing with the building closed up against the heat gives a hard, live interior and a lot of mechanical noise with nowhere to go. Those two things move the build-up far more than the panel figure does.

Does Abu Dhabi weather shorten the life of this material?

Abu Dhabi is hot and dry for most of the year, with dust and high daytime surface temperatures. Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves. The failure we design against here is dust ingress and thermal movement in long runs.

When would material land on a Abu Dhabi site?

ships from: Palwal, Haryana, India, arrives at: Khalifa Port or Jebel Ali, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

What should you not buy soundproofing materials for?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

Is there a minimum order, and how does it arrive?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send the drawings, get a straight answer

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.