For projects in Abu Dhabi
HVAC, plant and machine noise control in Abu Dhabi
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.
- At source
- Enclosure, barrier or anti vibration mounts at the machine.
- In the path
- Duct lining, attenuators and lagging on the first run out of the plant.
- At the receiver
- Only after the first two, and only for what is left.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What you are buying, and what it fixes in Abu Dhabi
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.
District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.
Work reaching us from Abu Dhabi is mostly hotels, cultural and institutional buildings, villas, offices, clinics, schools, studios.
- Concrete and glass, sealed all year Blockwork and full glazing with the building closed up against the heat gives a hard, live interior and a lot of mechanical noise with nowhere to go.
- Short sea leg from India Western Indian ports to the UAE is a short run. That is the practical reason a factory in India can hold an Abu Dhabi programme date, and it is why we quote sea rather than air for most orders.
- Submittals and samples Most work here goes through a consultant. Send us the specification and we will tell you where our material sits against it and where it does not, in writing.
- At source Enclosure, barrier or anti vibration mounts at the machine.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Abu Dhabi.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Abu Dhabi, district cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Wood wool acoustic panels
Wood fibre bound into a rigid board with an open texture. In Abu Dhabi, hotel ballrooms, mosques and conference centres are tall hard volumes where a long tail defeats the speech system before anyone hears a word.
On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Abu Dhabi, international school campuses are new, highly glazed and built to a tight programme. Sports halls, atria and lecture spaces are the rooms that need treating.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
If you are specifying for a Abu Dhabi project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / Local conditions
What decides the build-up in Abu Dhabi
- Concrete and glass, sealed all year
Blockwork and full glazing with the building closed up against the heat gives a hard, live interior and a lot of mechanical noise with nowhere to go.
- Short sea leg from India
Western Indian ports to the UAE is a short run. That is the practical reason a factory in India can hold an Abu Dhabi programme date, and it is why we quote sea rather than air for most orders.
- Submittals and samples
Most work here goes through a consultant. Send us the specification and we will tell you where our material sits against it and where it does not, in writing.
- MEP noise is the quiet problem
Heavy cooling loads mean large plant close to occupied space. Ducts, risers and plant rooms cause more complaints than anything in the room itself.
- Plant and HVAC
District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.
04 / Room by room
Space by space, for Abu Dhabi briefs
-

At source
Enclosure, barrier or anti vibration mounts at the machine. Blockwork and full glazing with the building closed up against the heat gives a hard, live interior and a lot of mechanical noise with nowhere to go.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Wood wool acoustic panels, 20 mm
- Ceiling baffles and clouds, Made to the drawing, standard and custom
-

In the path
Duct lining, attenuators and lagging on the first run out of the plant. Western Indian ports to the UAE is a short run. That is the practical reason a factory in India can hold an Abu Dhabi programme date, and it is why we quote sea rather than air for most orders.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Wood wool acoustic panels, 400 kg per cubic metre
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
-

At the receiver
Only after the first two, and only for what is left. Most work here goes through a consultant. Send us the specification and we will tell you where our material sits against it and where it does not, in writing.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Wood wool acoustic panels, 0.30
- Ceiling baffles and clouds, ASTM C423
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Conditions
Durability in Abu Dhabi, before acoustics is discussed
Abu Dhabi is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
Where a consultant is already engaged on a Abu Dhabi project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Before you buy
What we watch go wrong on jobs like this
-
Absorption on the office wall for a plant room problem
Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.
-
Lagging a duct that is carrying the noise as breakout from the fan
Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.
-
Ignoring structure borne vibration through the mounts
This is the one that comes back as a second fit-out rather than a snag.
-
Treating it as a generic Abu Dhabi job
Blockwork and full glazing with the building closed up against the heat gives a hard, live interior and a lot of mechanical noise with nowhere to go.
05 / Logistics
Getting it to Abu Dhabi, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Khalifa Port or Jebel Ali, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Khalifa Port |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
Sea freight into Khalifa Port or Jebel Ali, then road to site. The short transit means sea works for most programmes. Air freight for samples and urgent quantities.
Questions from Abu Dhabi projects
What makes HVAC, plant and machine noise control different in Abu Dhabi?
District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work. Western Indian ports to the UAE is a short run. That is the practical reason a factory in India can hold an Abu Dhabi programme date, and it is why we quote sea rather than air for most orders.
Where should the budget go first on a Abu Dhabi project?
At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.
Do you have an office or installation team in Abu Dhabi?
No. We manufacture in India and supply into Abu Dhabi. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Abu Dhabi site?
ships from: Palwal, Haryana, India, arrives at: Khalifa Port or Jebel Ali, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
What goes wrong most often on this kind of project?
Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.