Home > Warsaw > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Warsaw

Soundproofing materials in Warsaw

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Warsaw. Made at our own plant in India and shipped into Gdansk, then road to the city, with the inland leg written into the dates we quote.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

This comes from our own plant, not a trading desk. We do not have an office in your city and we will not invent one. What we can give you is factory pricing, consistent material and a technical answer before you commit.

01 / Start here

What this material is and where it earns its place in Warsaw

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Warsaw is mostly tower office floors, service centres, residential towers, hotels, schools, clinics.

Panel block housing with concrete walls that carry mass but no impact isolation, alongside new concrete towers with hard finishes.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Warsaw.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Specification

Published specification, identical wherever we ship it

We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

03 / What drives the brief

The Warsaw conditions that change the answer

  • Floors full of people talking

    Service centres and call floors put hundreds of simultaneous conversations in one room. Absorption alone will not deliver privacy there. Ceiling, screens and layout have to work together.

  • A very large office pipeline

    Warsaw builds office space at a pace few European cities match, which means the same detail repeated across many floors and buildings. Consistency across the order is the whole value.

  • New towers, hard surfaces

    Glass, raised floors and exposed slabs give sound nowhere to land, so the ceiling plane has to carry the room.

  • Residential towers going up fast

    New apartment towers share slabs and walls. Footfall and speech between units is easier to solve on the drawing than after the tenants arrive.

  • Plant and HVAC

    District heating in older stock and mechanical ventilation in newer, so duct noise arrives with the new build.

  • The housing stock

    Panel block housing with concrete walls that carry mass but no impact isolation, alongside new concrete towers with hard finishes.

For a Warsaw practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

04 / Climate and durability

The Warsaw climate decides the material list

Warsaw is cool and damp, with long heating seasons and cold external walls, and that narrows the sensible material list before acoustics is even discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The risk we design against here is condensation behind linings in older, poorly insulated stock.

For a Warsaw interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

05 / Supply

Getting it to Warsaw, with real dates

Supply into Warsaw
Ships fromPalwal, Haryana, India
Arrives atGdansk, then road to Warsaw
Dispatch4 to 7 working days
FreightSea via Gdansk
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Gdansk, then road to Warsaw. Air freight for samples and urgent quantities.

06 / Worth knowing

The things worth knowing before you place the order

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • A number chased without a measurement

    If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.

  • A claim of being local to Warsaw

    We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.

07 / In projects

The product on finished jobs

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Warsaw: questions we are actually asked

Do you manufacture soundproofing materials in Warsaw?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Warsaw as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Gdansk, then road to the city, with the inland leg written into the dates we quote. You buy at factory prices with one consistent batch across the order.

What do you look at first on a Warsaw enquiry?

Service centres and call floors put hundreds of simultaneous conversations in one room. Absorption alone will not deliver privacy there. Ceiling, screens and layout have to work together. Warsaw builds office space at a pace few European cities match, which means the same detail repeated across many floors and buildings. Consistency across the order is the whole value. Those two things move the build-up far more than the panel figure does.

Does Warsaw weather shorten the life of this material?

Warsaw is cool and damp, with long heating seasons and cold external walls. Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would. The failure we design against here is condensation behind linings in older, poorly insulated stock.

How quickly can material reach a site in Warsaw?

ships from: Palwal, Haryana, India, arrives at: Gdansk, then road to Warsaw, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

When are soundproofing materials the wrong purchase?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

How is the order packed and what is the minimum?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Drawings in, BOQ and a delivered date out

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.