A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
- Reverberation time
- Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
- Early reflections
- Shaped surfaces that send energy to the rear seats rather than absorbing everything.
- Rear wall
- The single worst surface in most halls, and the first one to treat.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The material, and what it actually does on a Vadodara job
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.
Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
Work reaching us from Vadodara is mostly engineering and process plant, colleges, hospitals, offices, auditoriums, hotels.
- Process and engineering plant Pumps, compressors and blowers running continuously close to occupied areas. Enclosure at the source is the answer.
- Control rooms and labs Spaces that need a genuinely low background before measurement or monitoring means anything.
- Teaching at scale Lecture halls in concrete and tile that defeat the speaker long before anyone calls the room echoey.
- Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Vadodara.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
Wood wool acoustic panels
Wood fibre bound into a rigid board with an open texture. In Vadodara, heavy industrial plant across the state, so compressors, presses and generator sets sit close to offices and canteens inside the same building.
With a porous backing. Board over mineral backing where the room needs more than the board alone gives.
-

Layer 2
Wooden slat acoustic panels
Timber slats on an acoustic backing. In Vadodara, auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
Slats on a cavity. Backing plus an air gap behind moves absorption lower, which matters in music rooms.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Vadodara, large school and college campuses in concrete and tile, with assembly halls and auditoria in constant use.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
If you are specifying for a Vadodara project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / Local conditions
What decides the build-up in Vadodara
- Process and engineering plant
Pumps, compressors and blowers running continuously close to occupied areas. Enclosure at the source is the answer.
- Control rooms and labs
Spaces that need a genuinely low background before measurement or monitoring means anything.
- Teaching at scale
Lecture halls in concrete and tile that defeat the speaker long before anyone calls the room echoey.
- Dry heat
PET felt does not sag, shed fibre or degrade at high temperature, which suits roof voids and sealed conditioned rooms.
- Assembly and performance rooms
Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
- School and campus buildings
Large school and college campuses in concrete and tile, with assembly halls and auditoria in constant use.
04 / Room by room
Room by room, on a typical Vadodara job
-

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Pumps, compressors and blowers running continuously close to occupied areas. Enclosure at the source is the answer.
- Wood wool acoustic panels, 1200 x 600 mm
- Wooden slat acoustic panels, 13-3, 14-2, 28-4 and 59-5
- Acoustic carpet and rugs, High density polyester
-

Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything. Spaces that need a genuinely low background before measurement or monitoring means anything.
- Wood wool acoustic panels, 20 mm
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
- Acoustic carpet and rugs, Felt
-

Rear wall
The single worst surface in most halls, and the first one to treat. Lecture halls in concrete and tile that defeat the speaker long before anyone calls the room echoey.
- Wood wool acoustic panels, 400 kg per cubic metre
- Wooden slat acoustic panels, 14, 16 and 18 mm
- Acoustic carpet and rugs, 64 sq ft per pack
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Climate
Durability in Vadodara, before acoustics is discussed
Vadodara is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Read this first
The six errors that cost the most
-
Absorbing the whole room and losing the back rows
Small on the drawing, expensive on site, and almost always found after handover.
-
Adding speakers to fix a reverberation problem
Small on the drawing, expensive on site, and almost always found after handover.
-
Ignoring the rear wall because it is behind the audience
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating it as a generic Vadodara job
Pumps, compressors and blowers running continuously close to occupied areas. Enclosure at the source is the answer.
05 / Getting it there
Supply into Vadodara, start to site
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | two days |
| Dispatch | 2 to 4 working days |
| To site | two days |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly nine hundred kilometres, normally two days on a dedicated truck.
Questions from Vadodara projects
What makes auditorium acoustics and soundproofing different in Vadodara?
Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey. Pumps, compressors and blowers running continuously close to occupied areas. Enclosure at the source is the answer.
Where should the budget go first on a Vadodara project?
Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Do you have an office or installation team in Vadodara?
No. We manufacture in India and supply into Vadodara. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Vadodara site?
made at: Our own plant, Palwal, Haryana, reaches site in: two days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up