Home > Switzerland > Hospital and healthcare acoustics

Hospital corridor with acoustic ceiling and wall treatment

For projects in Switzerland

Hospital and healthcare acoustics in Switzerland

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Mechanical ventilation with heat recovery is standard, so duct and terminal unit noise are the sources.

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work.
Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime.
Quote
From a plan and a section, within 48 hours

01 / Start here

The material, and what it actually does on a Switzerland job

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.

Mechanical ventilation with heat recovery is standard, so duct and terminal unit noise are the sources.

Work reaching us from Switzerland is mostly apartments, offices, alpine hotels, schools, clinics, studios, timber buildings.

  • Timber construction at scale Switzerland builds a lot in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work, not more absorption.
  • Landlocked, so plan the inland leg Rotterdam or Antwerp, then rail. We quote the sea leg and the inland leg separately so the programme runs on real dates.
  • The tolerance is zero If the sheet does not perform, you will find out and so will we. That is why we quote what the material does rather than what would win the order.
  • Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Switzerland.

Hospital soundproofing

02 / The build-up

The build-up, layer by layer

  1. Acoustic hanging ceiling baffles in a large open space

    Layer 1

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Switzerland, mechanical ventilation with heat recovery is standard, so duct and terminal unit noise are the sources.

    Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Switzerland, concert halls, church buildings and civic rooms are long-decay volumes where interventions must be reversible.

    Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.

  3. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 3

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Switzerland, school buildings are built to a high standard with hard cleanable surfaces, so rooms stay live and intelligibility is the target.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

If you are specifying for a Switzerland project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / On the ground

The Switzerland conditions that change the answer

  • Timber construction at scale

    Switzerland builds a lot in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work, not more absorption.

  • Landlocked, so plan the inland leg

    Rotterdam or Antwerp, then rail. We quote the sea leg and the inland leg separately so the programme runs on real dates.

  • The tolerance is zero

    If the sheet does not perform, you will find out and so will we. That is why we quote what the material does rather than what would win the order.

  • Floor area is extremely expensive

    Every centimetre a wall grows into the room is paid for. A dense membrane with a resilient break usually beats a thick framed build-up on both depth and cost.

  • Plant and HVAC

    Mechanical ventilation with heat recovery is standard, so duct and terminal unit noise are the sources.

04 / Room by room

Space by space, for Switzerland briefs

  • Hospital consultation room with acoustic wall treatment

    Consulting room privacy

    Speech privacy between rooms, which is partition, door and ceiling void work. Switzerland builds a lot in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work, not more absorption.

  • Hospital corridor with acoustic ceiling baffles and clouds

    Ward noise floor

    Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. Rotterdam or Antwerp, then rail. We quote the sea leg and the inland leg separately so the programme runs on real dates.

  • Hospital corridor doors with acoustic seals and curtains

    Cleanability

    Non shedding, non absorbent surfaces that survive a cleaning regime. If the sheet does not perform, you will find out and so will we. That is why we quote what the material does rather than what would win the order.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

Durability in Switzerland, before acoustics is discussed

Switzerland is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Read this first

Where this kind of project usually fails

  • Fabric wrapped products in a clinical area

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Absorption used where privacy was the requirement

    If the complaint is being overheard, no amount of absorption inside the room will fix it. That is a partition job and we will say so.

  • Ceiling void left open above a partition

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating it as a generic Switzerland job

    Switzerland builds a lot in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work, not more absorption.

05 / Supply

Getting it to Switzerland, with real dates

Supply into Switzerland
Ships fromPalwal, Haryana, India
Arrives atRotterdam or Antwerp, then rail and road inland
Dispatch4 to 7 working days
FreightSea via Rotterdam, then rail
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Rotterdam or Antwerp, then rail and road inland. Air freight for samples and urgent quantities.

FAQ

Questions from Switzerland projects

What makes hospital and healthcare acoustics different in Switzerland?

Mechanical ventilation with heat recovery is standard, so duct and terminal unit noise are the sources. If the sheet does not perform, you will find out and so will we. That is why we quote what the material does rather than what would win the order.

Where should the budget go first on a Switzerland project?

Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.

Do you have an office or installation team in Switzerland?

No. We manufacture in India and supply into Switzerland. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Switzerland site?

ships from: Palwal, Haryana, India, arrives at: Rotterdam or Antwerp, then rail and road inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.

script src="/assets/vendor/glightbox/js/glightbox.min.js">