Home > Switzerland > Home theatre soundproofing and acoustics

Luxury home theatre with acoustic panels and soundproofing

For projects in Switzerland

Home theatre soundproofing and acoustics in Switzerland

Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is. Concrete and masonry construction built to a high standard, with good mass and very hard internal finishes.

Containment
Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.
Low frequency inside
Corner absorption with depth, before any surface treatment.
Reflections
Side wall and ceiling first reflection points at the seating position.
Quote
From a plan and a section, within 48 hours

01 / Start here

What this material is and where it earns its place in Switzerland

Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is.

Concrete and masonry construction built to a high standard, with good mass and very hard internal finishes.

Work reaching us from Switzerland is mostly apartments, offices, alpine hotels, schools, clinics, studios, timber buildings.

  • Timber construction at scale Switzerland builds a lot in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work, not more absorption.
  • Landlocked, so plan the inland leg Rotterdam or Antwerp, then rail. We quote the sea leg and the inland leg separately so the programme runs on real dates.
  • The tolerance is zero If the sheet does not perform, you will find out and so will we. That is why we quote what the material does rather than what would win the order.
  • Containment Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for home theatre soundproofing are on the main product page. This page covers what that means for a project in Switzerland.

Home theatre soundproofing SoundBlanket mass loaded vinyl

02 / The build-up

The stack, in the order it is installed

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Switzerland, mechanical ventilation with heat recovery is standard, so duct and terminal unit noise are the sources.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 2

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Switzerland, concert halls, church buildings and civic rooms are long-decay volumes where interventions must be reversible.

    First reflection points. Mirror trick placement on side walls and ceiling, which is a handful of panels rather than a lined room.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Switzerland, school buildings are built to a high standard with hard cleanable surfaces, so rooms stay live and intelligibility is the target.

    Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.

Architects working in Switzerland usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / Local conditions

What the buildings in Switzerland do to the specification

  • Timber construction at scale

    Switzerland builds a lot in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work, not more absorption.

  • Landlocked, so plan the inland leg

    Rotterdam or Antwerp, then rail. We quote the sea leg and the inland leg separately so the programme runs on real dates.

  • The tolerance is zero

    If the sheet does not perform, you will find out and so will we. That is why we quote what the material does rather than what would win the order.

  • Floor area is extremely expensive

    Every centimetre a wall grows into the room is paid for. A dense membrane with a resilient break usually beats a thick framed build-up on both depth and cost.

  • The housing stock

    Concrete and masonry construction built to a high standard, with good mass and very hard internal finishes.

04 / Room by room

Space by space, for Switzerland briefs

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Climate and durability

The Switzerland climate decides the material list

Switzerland is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Straight talk

The six errors that cost the most

  • Foam on the walls as a soundproofing measure

    It sounds like a small detail until the room is finished and the complaint arrives.

  • A standard door on a room built to hold bass

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Treating before the room is sealed

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Treating it as a generic Switzerland job

    Switzerland builds a lot in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work, not more absorption.

05 / Getting it there

What the route into Switzerland actually looks like

Supply into Switzerland
Ships fromPalwal, Haryana, India
Arrives atRotterdam or Antwerp, then rail and road inland
Dispatch4 to 7 working days
FreightSea via Rotterdam, then rail
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Rotterdam or Antwerp, then rail and road inland. Air freight for samples and urgent quantities.

FAQ

Questions from Switzerland projects

What makes home theatre soundproofing and acoustics different in Switzerland?

Concrete and masonry construction built to a high standard, with good mass and very hard internal finishes. If the sheet does not perform, you will find out and so will we. That is why we quote what the material does rather than what would win the order.

Where should the budget go first on a Switzerland project?

Containment. Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point. Low frequency inside. Corner absorption with depth, before any surface treatment.

Do you have an office or installation team in Switzerland?

No. We manufacture in India and supply into Switzerland. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Switzerland site?

ships from: Palwal, Haryana, India, arrives at: Rotterdam or Antwerp, then rail and road inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Foam on the walls as a soundproofing measure. A standard door on a room built to hold bass.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.

script src="/assets/vendor/glightbox/js/glightbox.min.js">