For projects in Sweden
Cinema and multiplex soundproofing in Sweden
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Church buildings, culture houses and school halls are hard long-decay volumes.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What this is, and what it changes in a Sweden room
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Church buildings, culture houses and school halls are hard long-decay volumes.
Work reaching us from Sweden is mostly timber buildings and apartments, offices, schools, healthcare, hotels, studios.
- Classes are written and verified Projects arrive with a class and someone checks it afterwards. Send us the target and we will say where our material sits against it.
- Timber at scale Sweden builds tall in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work.
- Sealed through a long winter Ventilation runs constantly in closed buildings, so plant noise matters more than street noise.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Sweden.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Sweden, balanced mechanical ventilation with heat recovery running through long heating seasons, so duct noise is constant.
Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Sweden, church buildings, culture houses and school halls are hard long-decay volumes.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Sweden, classroom acoustics are regulated, and open plan learning areas make speech intelligibility the design target.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / In this market
The Sweden conditions that change the answer
- Classes are written and verified
Projects arrive with a class and someone checks it afterwards. Send us the target and we will say where our material sits against it.
- Timber at scale
Sweden builds tall in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work.
- Sealed through a long winter
Ventilation runs constantly in closed buildings, so plant noise matters more than street noise.
- A long country
A site in the north has a real domestic leg. We quote it separately so the dates are honest.
- Assembly and performance rooms
Church buildings, culture houses and school halls are hard long-decay volumes.
04 / Room by room
What each space in a Sweden project needs
-

Screen to screen
Independent construction between auditoria, with services broken at the line. Projects arrive with a class and someone checks it afterwards. Send us the target and we will say where our material sits against it.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Acoustic carpet and rugs, High density polyester
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Sweden builds tall in timber, and timber is light. Low frequency passes easily, so mass and decoupling do the work.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Acoustic carpet and rugs, Felt
-

Plant and projection
Equipment noise into the auditorium, treated at source. Ventilation runs constantly in closed buildings, so plant noise matters more than street noise.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
- Acoustic carpet and rugs, 64 sq ft per pack
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate and durability
What the Sweden climate rules in and rules out
Sweden is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Before you buy
What we watch go wrong on jobs like this
-
A shared service void running across the wall line
A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.
-
Treating the auditorium to fix bleed from the next screen
Small on the drawing, expensive on site, and almost always found after handover.
-
Doors and lobbies specified late and undersized
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Treating it as a generic Sweden job
Projects arrive with a class and someone checks it afterwards. Send us the target and we will say where our material sits against it.
05 / Logistics
Getting it to Sweden, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Gothenburg, then road onward to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Gothenburg |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Gothenburg, then road onward to site. Air freight for samples and urgent quantities.
Questions from Sweden projects
What makes cinema and multiplex soundproofing different in Sweden?
Church buildings, culture houses and school halls are hard long-decay volumes. Projects arrive with a class and someone checks it afterwards. Send us the target and we will say where our material sits against it.
Where should the budget go first on a Sweden project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Sweden?
No. We manufacture in India and supply into Sweden. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Sweden site?
ships from: Palwal, Haryana, India, arrives at: Gothenburg, then road onward to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.