Manufactured in India, supplied in Sonipat
Soundproofing materials in Sonipat
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Sonipat. Sonipat has become a university town alongside its industrial estates, which gives us campus work and plant work from the same district.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.
01 / The material
What this is, and what it changes in a Sonipat room
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Sonipat is mostly university campuses, lecture halls and hostels, industrial units, offices, clinics, schools.
Builder floors and RC frame apartments with tile and stone floors, often built floor by floor for separate households.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Sonipat.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
One specification sheet, the same in every market
The specification below is the same everywhere we supply, because a specification that changed by city would not be a specification. What changes is which grade and build-up is the right buy, and that is what the rest of this page is about.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
03 / On the ground
What decides the build-up in Sonipat
- Campus repetition
The same classroom or hostel detail across many blocks. Consistency across the order matters more than the figure on one sheet.
- Lecture halls defeat the speaker
Large teaching rooms in concrete and tile lose intelligibility long before anyone calls the room echoey.
- Industrial units nearby
Machinery close to occupied areas, where enclosure at the source is the reliable answer.
- An hour from the plant
Next day delivery, quick samples, and a site visit when the room is difficult.
- Plant and HVAC
Dense industrial belts mean compressors, presses, generator sets and blower plant sit close to offices and canteens.
- The housing stock
Builder floors and RC frame apartments with tile and stone floors, often built floor by floor for separate households.
For a Sonipat practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Climate and durability
Durability in Sonipat, before acoustics is discussed
Sonipat is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
For a Sonipat interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
05 / Logistics
What the route into Sonipat actually looks like
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | same or next day |
| Dispatch | 2 to 4 working days |
| To site | same or next day |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
Same or next day by road from Palwal, about a hundred and twenty kilometres.
06 / Worth knowing
The things worth knowing before you place the order
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Coverage bought instead of a target
Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.
-
Suppliers who imply a Sonipat presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
In finished rooms
Sonipat: questions we are actually asked
Where are the soundproofing materials you supply to Sonipat actually made?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Sonipat as the manufacturer rather than through a dealer. Sonipat has become a university town alongside its industrial estates, which gives us campus work and plant work from the same district. You buy at factory prices with one consistent batch across the order.
What decides the specification for a Sonipat project?
The same classroom or hostel detail across many blocks. Consistency across the order matters more than the figure on one sheet. Large teaching rooms in concrete and tile lose intelligibility long before anyone calls the room echoey. Those two things move the build-up far more than the panel figure does.
Will this material last in the Sonipat climate?
Sonipat is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
How quickly can material reach a site in Sonipat?
made at: Our own plant, Palwal, Haryana, reaches site in: same or next day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
What will soundproofing materials not do?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
How is the order packed and what is the minimum?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.