- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / The material
What this is, and what it changes in a Shillong room
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Shillong is mostly practice and performance rooms, schools and colleges, hotels, churches and halls, clinics, offices.
RC frame and timber construction with hard floors, in one of the wettest places on earth where moisture resistance decides the material.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Shillong.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
The published figures, unchanged by location
These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
03 / In this market
What decides the build-up in Shillong
- Timber and light construction
Hill building is often light, which passes low frequency easily. Mass and decoupling do the work.
- Hill roads on the last leg
The final stretch is steep and rough. We pack for that rather than for a straight highway run.
- Rain on the roof
Metal roofing under extreme rainfall turns a downpour into a noise source that stops a lesson or a recording. It is worth designing for rather than discovering.
- A music city
Practice rooms, choirs and performance spaces in ordinary buildings. Isolation from neighbours is what keeps them usable.
- Plant and HVAC
Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.
- The housing stock
RC frame and timber construction with hard floors, in one of the wettest places on earth where moisture resistance decides the material.
For a Shillong practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Climate
The Shillong climate decides the material list
Shillong is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
05 / Getting it there
Supply into Shillong, start to site
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | five days |
| Dispatch | 2 to 4 working days |
| To site | five days |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly two thousand kilometres, normally five days on a dedicated truck. The final hill leg is planned into the schedule.
06 / Worth knowing
What we will tell you that a reseller will not
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
Suppliers who imply a Shillong presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
The product on finished jobs
Shillong: questions we are actually asked
Are these soundproofing materials made in Shillong?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Shillong as the manufacturer rather than through a dealer. Shillong gets more rain than almost anywhere on earth, and it has a serious music culture. You buy at factory prices with one consistent batch across the order.
What decides the specification for a Shillong project?
Metal roofing under extreme rainfall turns a downpour into a noise source that stops a lesson or a recording. It is worth designing for rather than discovering. Practice rooms, choirs and performance spaces in ordinary buildings. Isolation from neighbours is what keeps them usable. Those two things move the build-up far more than the panel figure does.
How does the Shillong climate affect this product?
Shillong is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
When would material land on a Shillong site?
made at: Our own plant, Palwal, Haryana, reaches site in: five days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
What will soundproofing materials not do?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
Is there a minimum order, and how does it arrive?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Drawings in, BOQ and a delivered date out
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.