Home > Sharjah > Office acoustics and soundproofing

Modern office interior with acoustic treatment

For projects in Sharjah

Office acoustics and soundproofing in Sharjah

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Meeting rooms
Privacy between rooms. That is partition and door work, not panels.
Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a Sharjah brief

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.

District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.

Work reaching us from Sharjah is mostly residential towers, fit-out contractors, factories and warehouses, schools, clinics, offices.

  • Buying direct from the factory Most material here arrives through a trader. Buying from the plant removes a layer of margin, and it means the person answering your technical question made the product.
  • Dense mid-rise living Tower and mid-rise blocks stack families above each other on blockwork and concrete slabs. Footfall, speech and TV noise between flats is the complaint we hear most.
  • Industrial and warehouse work Plant rooms, generator halls, compressor bays and workshops need mass and isolation, not decorative absorption. We say so rather than selling you panels.
  • Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Sharjah.

Office and conference room acoustics Acoustic office screens

02 / The build-up

The build-up, layer by layer

  1. Acoustic hanging ceiling baffles in a large open space

    Layer 1

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Sharjah, district cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.

    Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Sharjah, hotel ballrooms, mosques and conference centres are tall hard volumes where a long tail defeats the speech system before anyone hears a word.

    Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.

  3. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 3

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Sharjah, international school campuses are new, highly glazed and built to a tight programme. Sports halls, atria and lecture spaces are the rooms that need treating.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / In this market

What decides the build-up in Sharjah

  • Buying direct from the factory

    Most material here arrives through a trader. Buying from the plant removes a layer of margin, and it means the person answering your technical question made the product.

  • Dense mid-rise living

    Tower and mid-rise blocks stack families above each other on blockwork and concrete slabs. Footfall, speech and TV noise between flats is the complaint we hear most.

  • Industrial and warehouse work

    Plant rooms, generator halls, compressor bays and workshops need mass and isolation, not decorative absorption. We say so rather than selling you panels.

  • Fit-out contractors serving the whole UAE

    A lot of Sharjah businesses fit out sites across the Emirates. We quote full container loads and stage deliveries against the programme.

  • Plant and HVAC

    District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.

04 / Room by room

What each space in a Sharjah project needs

  • Office ceiling with acoustic clouds and baffles

    Open plan

    Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Most material here arrives through a trader. Buying from the plant removes a layer of margin, and it means the person answering your technical question made the product.

  • Acoustic wall panels in office

    Meeting rooms

    Privacy between rooms. That is partition and door work, not panels. Tower and mid-rise blocks stack families above each other on blockwork and concrete slabs. Footfall, speech and TV noise between flats is the complaint we hear most.

  • Office acoustic carpet tiles and rugs

    Cabins and calls

    Short RT so a call sounds clean. A small amount of well placed absorber. Plant rooms, generator halls, compressor bays and workshops need mass and isolation, not decorative absorption. We say so rather than selling you panels.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Conditions

The Sharjah climate decides the material list

Sharjah is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The failure we design against here is dust ingress and thermal movement in long runs.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Read this first

What we watch go wrong on jobs like this

  • Lining every wall while leaving the ceiling bare

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating a privacy problem with absorption

    Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.

  • Glass cabins specified without a door and head detail

    Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.

  • Treating it as a generic Sharjah job

    Most material here arrives through a trader. Buying from the plant removes a layer of margin, and it means the person answering your technical question made the product.

05 / Route to site

Supply into Sharjah, start to site

Supply into Sharjah
Ships fromPalwal, Haryana, India
Arrives atPort Khalid or Jebel Ali, then road to site
Dispatch4 to 7 working days
FreightSea via Port Khalid
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

Sea freight into Port Khalid or Jebel Ali, then road to site. The transit from western India is short enough that sea suits most programmes. Air freight for samples and urgent quantities.

FAQ

Questions from Sharjah projects

What makes office acoustics and soundproofing different in Sharjah?

District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work. Most material here arrives through a trader. Buying from the plant removes a layer of margin, and it means the person answering your technical question made the product.

Where should the budget go first on a Sharjah project?

Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.

Do you have an office or installation team in Sharjah?

No. We manufacture in India and supply into Sharjah. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Sharjah site?

ships from: Palwal, Haryana, India, arrives at: Port Khalid or Jebel Ali, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

What goes wrong most often on this kind of project?

Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.