Manufactured in India, supplied in Seoul
Acoustic carpet and rugs in Seoul
We manufacture acoustic carpet and rugs at our own plant at Palwal in Haryana, India, and supply them into Seoul. Made at our own plant in India and shipped into Incheon, close to the city, so the road leg after the port is short.
- Tile size
- 500 x 500 mm
- Thickness
- 4 mm
- Face
- High density polyester
- Backing
- Felt
- Pack coverage
- 64 sq ft per pack
- Lead time
- 4 to 7 working days
- Minimum order
- From 320 sq ft
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
- Test reports sent on request, not just quoted
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / The material
What this is, and what it changes in a Seoul room
A tile carpet with a dense polyester face on a felt backing. It absorbs at the floor and, more usefully, kills footfall and chair scrape at the point they are generated.
Work reaching us from Seoul is mostly apartment towers, offices, studios and content rooms, cafes and dining, clinics, schools.
Reinforced concrete apartment towers with underfloor heating and hard floors. Impact noise between floors is the single biggest residential complaint.
- Loose lay on tackifier Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
- Over a resilient underlay Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
- Zoned Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
- What it will not do Carpet fixes footfall and chair noise and takes the edge off a live room. It will not deliver a reverberation target on its own, because the ceiling is almost always the bigger surface.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for acoustic carpet and rugs are on the main product page. This page covers what that means for a project in Seoul.
02 / The numbers
Published specification, identical wherever we ship it
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Standard tile4 mm. Offices, classrooms, studios, corridors
| Tile size | 500 x 500 mm |
|---|---|
| Thickness | 4 mm |
| Face | High density polyester |
| Backing | Felt |
| Pack coverage | 64 sq ft per pack |
| Boxed | 20 kg, 55 x 55 x 15 cm |
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
03 / In this market
What decides the build-up in Seoul
- Content rooms everywhere
Studios, streaming rooms and practice spaces inside residential and commercial towers. Isolation from the building is what makes them usable.
- It is the floor, not the wall
Impact noise from above dominates complaints in this city. The fix goes under the finish before the finish goes down, not on the ceiling afterwards.
- Dense, vertical, mixed use
Cafes and venues sit underneath homes in the same structure, so containment decides trading hours.
- Incheon is close
A short road leg after the port keeps landed cost and dates predictable.
- Assembly and performance rooms
Church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.
- The housing stock
Reinforced concrete apartment towers with underfloor heating and hard floors. Impact noise between floors is the single biggest residential complaint.
For a Seoul practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Climate
What the Seoul climate rules in and rules out
Seoul is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Supply
What the route into Seoul actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Incheon, then a short road run into Seoul |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Incheon |
| Packing | Boxed, 64 sq ft per pack, 20 kg. Easy to carry up a stair, which matters on fit-out sites with no lift access. |
| Lead time | 4 to 7 working days. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Incheon, then a short road run into Seoul. Air freight for samples and urgent quantities.
The same minimums apply on export.
| Carpet tiles | 320 sq ft, about 30 sq m |
|---|---|
| Rugs | 500 sq ft, about 46 sq m |
A pack of tiles covers 64 sq ft and weighs 20 kg boxed, so the tile minimum is exactly five packs and about 100 kg.
06 / Read this first
Four honest warnings before you buy
-
The wrong product for the problem
Carpet fixes footfall and chair noise and takes the edge off a live room. It will not deliver a reverberation target on its own, because the ceiling is almost always the bigger surface.
-
Coverage bought instead of a target
Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.
-
A claim of being local to Seoul
We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.
Seoul: questions we are actually asked
Do you manufacture acoustic carpet and rugs in Seoul?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Seoul as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Incheon, close to the city, so the road leg after the port is short. You buy at factory prices with one consistent batch across the order.
What do you look at first on a Seoul enquiry?
Impact noise from above dominates complaints in this city. The fix goes under the finish before the finish goes down, not on the ceiling afterwards. Studios, streaming rooms and practice spaces inside residential and commercial towers. Isolation from the building is what makes them usable. Those two things move the build-up far more than the panel figure does.
Is this the right material for Seoul conditions?
Seoul is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
What is the delivery time into Seoul?
ships from: Palwal, Haryana, India, arrives at: Incheon, then a short road run into Seoul, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Where do acoustic carpet and rugs fail to help?
Carpet fixes footfall and chair noise and takes the edge off a live room. It will not deliver a reverberation target on its own, because the ceiling is almost always the bigger surface.
What quantity do we have to order, and in what packaging?
The same minimums apply on export. Carpet tiles, 320 sq ft, about 30 sq m. Rugs, 500 sq ft, about 46 sq m. A pack of tiles covers 64 sq ft and weighs 20 kg boxed, so the tile minimum is exactly five packs and about 100 kg. Boxed, 64 sq ft per pack, 20 kg. Easy to carry up a stair, which matters on fit-out sites with no lift access.
Next step
Tell us the room, we will tell you the build-up
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.