We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Peru. Made at our own plant in India and shipped into Callao, which sits next to Lima, so the road leg for most commercial work is short.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / The product
What you are buying, and what it fixes in Peru
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Peru is mostly offices, apartments, mining and industrial facilities, hotels, hospitals, schools.
Concrete and block construction with hard floors, in buildings that sit close together and share walls.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Peru.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / The numbers
One specification sheet, the same in every market
These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
03 / In this market
The Peru conditions that change the answer
- Callao is next to the market
The port sits beside Lima, so most commercial deliveries have almost no inland leg. Mining sites inland are a different calculation and we quote them separately.
- Mining plant and control rooms
Continuous machinery and rooms where operators listen for alarms. Enclosure and a low background, not decorative absorption.
- Dry coastal climate
Lima is dry and mild. Material stability is straightforward, and PET felt does not degrade or shed in these conditions.
- Concrete construction
Walls carry mass, so hard live interiors and services noise are the usual complaints rather than transmission between rooms.
- Plant and HVAC
Split units with condensers on facades and rooftops, running through a mild coastal climate.
- The housing stock
Concrete and block construction with hard floors, in buildings that sit close together and share walls.
Architects working in Peru usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
04 / Climate
Durability in Peru, before acoustics is discussed
Peru is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Getting it there
Supply into Peru, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Callao, next to Lima, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Callao |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Callao, then a short road run for Lima work or a longer inland leg for mining sites. Air freight for samples.
06 / Worth knowing
The things worth knowing before you place the order
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Square footage quoted before the room is understood
Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.
-
Suppliers who imply a Peru presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
In finished rooms
Peru: questions we are actually asked
Do you manufacture soundproofing materials in Peru?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Peru as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Callao, which sits next to Lima, so the road leg for most commercial work is short. You buy at factory prices with one consistent batch across the order.
What decides the specification for a Peru project?
The port sits beside Lima, so most commercial deliveries have almost no inland leg. Mining sites inland are a different calculation and we quote them separately. Continuous machinery and rooms where operators listen for alarms. Enclosure and a low background, not decorative absorption. Those two things move the build-up far more than the panel figure does.
Will this material last in the Peru climate?
Peru is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
When would material land on a Peru site?
ships from: Palwal, Haryana, India, arrives at: Callao, next to Lima, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
Is there a minimum order, and how does it arrive?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.