Manufactured in India, supplied in Nigeria
Acoustic carpet and rugs in Nigeria
We manufacture acoustic carpet and rugs at our own plant at Palwal in Haryana, India, and supply them into Nigeria. Made at our own plant in India and shipped into Lagos or Onne.
- Tile size
- 500 x 500 mm
- Thickness
- 4 mm
- Face
- High density polyester
- Backing
- Felt
- Pack coverage
- 64 sq ft per pack
- Lead time
- 4 to 7 working days
- Minimum order
- From 320 sq ft
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
- Test reports sent on request, not just quoted
This comes from our own plant, not a trading desk. We do not have an office in your city and we will not invent one. What we can give you is factory pricing, consistent material and a technical answer before you commit.
01 / What it is
The material, and what it actually does on a Nigeria job
A tile carpet with a dense polyester face on a felt backing. It absorbs at the floor and, more usefully, kills footfall and chair scrape at the point they are generated.
Work reaching us from Nigeria is mostly places of assembly, offices, hotels, generator and plant enclosures, schools, hospitals.
Concrete and block construction with hard floors. Estates and apartment blocks sit close together with generators between them.
- Loose lay on tackifier Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
- Over a resilient underlay Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
- Zoned Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
- What it will not do Carpet fixes footfall and chair noise and takes the edge off a live room. It will not deliver a reverberation target on its own, because the ceiling is almost always the bigger surface.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for acoustic carpet and rugs are on the main product page. This page covers what that means for a project in Nigeria.
02 / Specification
One specification sheet, the same in every market
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Standard tile4 mm. Offices, classrooms, studios, corridors
| Tile size | 500 x 500 mm |
|---|---|
| Thickness | 4 mm |
| Face | High density polyester |
| Backing | Felt |
| Pack coverage | 64 sq ft per pack |
| Boxed | 20 kg, 55 x 55 x 15 cm |
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
03 / On the ground
What we see driving Nigeria briefs
- Humid and hot
PET felt does not hold moisture or feed mould, which matters where mineral products sag within a couple of seasons.
- Generators are a permanent condition
Standby generation runs constantly in many buildings and sits close to occupied space. Enclosure and mass, not absorption, is the answer.
- Very large assembly halls
Congregations in the thousands in hard concrete volumes. Intelligibility fails long before anyone describes the room as echoey.
- Port congestion is real
Lagos can be slow to clear. We quote a realistic window rather than a best case, and we will say if another port suits you better.
- Assembly and performance rooms
Church buildings and event halls are large hard rooms carrying amplified music at very high level.
- The housing stock
Concrete and block construction with hard floors. Estates and apartment blocks sit close together with generators between them.
For a Nigeria practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Durability
The Nigeria climate decides the material list
Nigeria is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The risk we design against here is mould, sagging fabric finishes and swelling in timber.
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
05 / Route to site
What the route into Nigeria actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Lagos or Onne, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Lagos or Onne |
| Packing | Boxed, 64 sq ft per pack, 20 kg. Easy to carry up a stair, which matters on fit-out sites with no lift access. |
| Lead time | 4 to 7 working days. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Lagos or Onne, then road to site. Air freight for samples and urgent quantities.
The same minimums apply on export.
| Carpet tiles | 320 sq ft, about 30 sq m |
|---|---|
| Rugs | 500 sq ft, about 46 sq m |
A pack of tiles covers 64 sq ft and weighs 20 kg boxed, so the tile minimum is exactly five packs and about 100 kg.
06 / Straight talk
Where this goes wrong, said plainly
-
The wrong product for the problem
Carpet fixes footfall and chair noise and takes the edge off a live room. It will not deliver a reverberation target on its own, because the ceiling is almost always the bigger surface.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
A claim of being local to Nigeria
We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.
Nigeria: questions we are actually asked
Are these acoustic carpet and rugs made in Nigeria?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Nigeria as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Lagos or Onne. You buy at factory prices with one consistent batch across the order.
What decides the specification for a Nigeria project?
Standby generation runs constantly in many buildings and sits close to occupied space. Enclosure and mass, not absorption, is the answer. Congregations in the thousands in hard concrete volumes. Intelligibility fails long before anyone describes the room as echoey. Those two things move the build-up far more than the panel figure does.
How does the Nigeria climate affect this product?
Nigeria is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.
What is the delivery time into Nigeria?
ships from: Palwal, Haryana, India, arrives at: Lagos or Onne, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Where do acoustic carpet and rugs fail to help?
Carpet fixes footfall and chair noise and takes the edge off a live room. It will not deliver a reverberation target on its own, because the ceiling is almost always the bigger surface.
What is the minimum order and how is it packed?
The same minimums apply on export. Carpet tiles, 320 sq ft, about 30 sq m. Rugs, 500 sq ft, about 46 sq m. A pack of tiles covers 64 sq ft and weighs 20 kg boxed, so the tile minimum is exactly five packs and about 100 kg. Boxed, 64 sq ft per pack, 20 kg. Easy to carry up a stair, which matters on fit-out sites with no lift access.
Next step
Tell us the room, we will tell you the build-up
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.