Home > New Zealand > Office acoustics and soundproofing

Modern office interior with acoustic treatment

For projects in New Zealand

Office acoustics and soundproofing in New Zealand

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Heat pumps and ducted systems, with outdoor units close to boundaries in dense suburbs.

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Meeting rooms
Privacy between rooms. That is partition and door work, not panels.
Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber.
Quote
From a plan and a section, within 48 hours

01 / The material

What this material is and where it earns its place in New Zealand

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.

Heat pumps and ducted systems, with outdoor units close to boundaries in dense suburbs.

Work reaching us from New Zealand is mostly timber frame housing, apartments, offices, schools, clinics, studios.

  • Timber frame, very little mass Light construction passes low frequency easily. Added mass and a decoupled layer do the work, and absorption alone will not.
  • Designed to move Seismic detailing means junctions and joints that have to stay flexible. An acoustic build-up has to respect that rather than bridge it rigidly.
  • A long sea leg This is one of the longest routes we run. Ordering to a real schedule matters more here than anywhere else, so we quote the full window.
  • Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in New Zealand.

Office and conference room acoustics Acoustic office screens

02 / The build-up

The build-up, layer by layer

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In New Zealand, heat pumps and ducted systems, with outdoor units close to boundaries in dense suburbs.

    Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In New Zealand, school halls, marae and community centres carry speech and performance in the same hard room.

    Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.

  3. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 3

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In New Zealand, classroom acoustics are taken seriously and open plan learning spaces are common, which makes speech intelligibility the design target.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

If you are specifying for a New Zealand project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / In this market

What we see driving New Zealand briefs

  • Timber frame, very little mass

    Light construction passes low frequency easily. Added mass and a decoupled layer do the work, and absorption alone will not.

  • Designed to move

    Seismic detailing means junctions and joints that have to stay flexible. An acoustic build-up has to respect that rather than bridge it rigidly.

  • A long sea leg

    This is one of the longest routes we run. Ordering to a real schedule matters more here than anywhere else, so we quote the full window.

  • Damp and variable climate

    PET felt does not absorb moisture, shed fibre or feed mould, which suits cold external walls and sealed rooms.

  • Plant and HVAC

    Heat pumps and ducted systems, with outdoor units close to boundaries in dense suburbs.

04 / Room by room

Where the money goes on a New Zealand project

  • Office ceiling with acoustic clouds and baffles

    Open plan

    Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Light construction passes low frequency easily. Added mass and a decoupled layer do the work, and absorption alone will not.

  • Acoustic wall panels in office

    Meeting rooms

    Privacy between rooms. That is partition and door work, not panels. Seismic detailing means junctions and joints that have to stay flexible. An acoustic build-up has to respect that rather than bridge it rigidly.

  • Office acoustic carpet tiles and rugs

    Cabins and calls

    Short RT so a call sounds clean. A small amount of well placed absorber. This is one of the longest routes we run. Ordering to a real schedule matters more here than anywhere else, so we quote the full window.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Conditions

Durability in New Zealand, before acoustics is discussed

New Zealand is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Read this first

Where this kind of project usually fails

  • Lining every wall while leaving the ceiling bare

    The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.

  • Treating a privacy problem with absorption

    Privacy is a transmission problem. Absorption makes the room sound nicer and does not stop anyone hearing through the wall.

  • Glass cabins specified without a door and head detail

    A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.

  • Treating it as a generic New Zealand job

    Light construction passes low frequency easily. Added mass and a decoupled layer do the work, and absorption alone will not.

05 / Logistics

Getting it to New Zealand, with real dates

Supply into New Zealand
Ships fromPalwal, Haryana, India
Arrives atAuckland or Tauranga, then road to site
Dispatch4 to 7 working days
FreightSea via Auckland
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Auckland or Tauranga, then road to site. Air freight for samples and genuinely urgent quantities.

FAQ

Questions from New Zealand projects

What makes office acoustics and soundproofing different in New Zealand?

Heat pumps and ducted systems, with outdoor units close to boundaries in dense suburbs. Light construction passes low frequency easily. Added mass and a decoupled layer do the work, and absorption alone will not.

Where should the budget go first on a New Zealand project?

Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.

Do you have an office or installation team in New Zealand?

No. We manufacture in India and supply into New Zealand. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a New Zealand site?

ships from: Palwal, Haryana, India, arrives at: Auckland or Tauranga, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.