Home > Nashik > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Nashik

Soundproofing materials in Nashik

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Nashik. Nashik puts wineries, pharmaceutical plants and pilgrimage hospitality in one district, which gives us an unusually varied set of rooms.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.

01 / Start here

What you are buying, and what it fixes in Nashik

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Nashik is mostly wineries and tasting rooms, pharmaceutical and engineering plants, assembly halls, hotels, schools.

Towers and chawls side by side, in RC frame with tile floors. Redevelopment stock shares slabs and lift cores, and monsoon damp rules out anything that holds moisture.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Nashik.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Data sheet

The numbers, and they do not move by city

We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

Where a consultant is already engaged on a Nashik project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

03 / On the ground

What the buildings in Nashik do to the specification

  • Tasting rooms and cellars

    Hard stone and concrete volumes where guests are expected to talk. Ceiling absorption does almost all of the work.

  • Pharmaceutical and clean areas

    Plant noise next to controlled spaces, where mechanical noise is a design problem rather than a comfort one.

  • Large assembly at intervals

    Spaces built for very large gatherings that stand mostly empty between them, so the design has to work at full capacity.

  • Three days by road

    A dedicated truck from Palwal, confirmed before dispatch, with samples sent ahead.

  • Plant and HVAC

    Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.

  • The housing stock

    Towers and chawls side by side, in RC frame with tile floors. Redevelopment stock shares slabs and lift cores, and monsoon damp rules out anything that holds moisture.

Architects working in Nashik usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

04 / Conditions

The Nashik climate decides the material list

Nashik is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The risk we design against here is mould, sagging fabric finishes and swelling in timber.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

05 / Supply

What the route into Nashik actually looks like

Supply into Nashik
Made atOur own plant, Palwal, Haryana
Reaches site inthree days
Dispatch2 to 4 working days
To sitethree days
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

By road from Palwal, roughly thirteen hundred kilometres, normally three days on a dedicated truck.

06 / Worth knowing

What we will tell you that a reseller will not

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • Coverage bought instead of a target

    Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.

  • A claim of being local to Nashik

    We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.

07 / In projects

In finished rooms

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Nashik: questions we are actually asked

Do you manufacture soundproofing materials in Nashik?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Nashik as the manufacturer rather than through a dealer. Nashik puts wineries, pharmaceutical plants and pilgrimage hospitality in one district, which gives us an unusually varied set of rooms. You buy at factory prices with one consistent batch across the order.

What decides the specification for a Nashik project?

Hard stone and concrete volumes where guests are expected to talk. Ceiling absorption does almost all of the work. Plant noise next to controlled spaces, where mechanical noise is a design problem rather than a comfort one. Those two things move the build-up far more than the panel figure does.

Will this material last in the Nashik climate?

Nashik is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.

How quickly can material reach a site in Nashik?

made at: Our own plant, Palwal, Haryana, reaches site in: three days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

What should you not buy soundproofing materials for?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

What quantity do we have to order, and in what packaging?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Drawings in, BOQ and a delivered date out