Home > Milan > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Milan

Auditorium acoustics and soundproofing in Milan

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Churches, theatres and civic halls are stone and plaster volumes with decay times measured in seconds.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a Milan brief

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Churches, theatres and civic halls are stone and plaster volumes with decay times measured in seconds.

Work reaching us from Milan is mostly showrooms, studios, offices in Porta Nuova and CityLife, restaurants, hotels, apartments.

  • Showrooms and retail fit-outs Hard floors, glass and high ceilings are the look. Absorption has to go where it does the work and disappears, usually the ceiling plane and the upper wall.
  • Courtyard buildings The classic Milanese block puts flats, offices and a restaurant around one courtyard. Everything shares walls and slabs, so containment matters more than treatment.
  • Towers with nothing soft in them Porta Nuova and CityLife floors are glass to glass with raised floors and exposed slabs. Speech carries because there is nothing for it to land on.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Milan.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

The build-up, layer by layer

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Milan, split and multi-split systems with condensers in courtyards that reflect noise back into every flat.

    Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.

  2. Acoustic hanging ceiling baffles in a large open space

    Layer 2

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Milan, churches, theatres and civic halls are stone and plaster volumes with decay times measured in seconds.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Milan, school buildings are hard surfaced with high ceilings, and many sit inside older structures where intervention has to be reversible.

    Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.

If you are specifying for a Milan project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / On the ground

The Milan conditions that change the answer

  • Showrooms and retail fit-outs

    Hard floors, glass and high ceilings are the look. Absorption has to go where it does the work and disappears, usually the ceiling plane and the upper wall.

  • Courtyard buildings

    The classic Milanese block puts flats, offices and a restaurant around one courtyard. Everything shares walls and slabs, so containment matters more than treatment.

  • Towers with nothing soft in them

    Porta Nuova and CityLife floors are glass to glass with raised floors and exposed slabs. Speech carries because there is nothing for it to land on.

  • Design deadlines that do not move

    Showroom and fair programmes run to a fixed opening. We give real dispatch and transit dates so the fit-out is not waiting on a container.

  • Assembly and performance rooms

    Churches, theatres and civic halls are stone and plaster volumes with decay times measured in seconds.

  • School and campus buildings

    School buildings are hard surfaced with high ceilings, and many sit inside older structures where intervention has to be reversible.

04 / Room by room

Space by space, for Milan briefs

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Hard floors, glass and high ceilings are the look. Absorption has to go where it does the work and disappears, usually the ceiling plane and the upper wall.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. The classic Milanese block puts flats, offices and a restaurant around one courtyard. Everything shares walls and slabs, so containment matters more than treatment.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Porta Nuova and CityLife floors are glass to glass with raised floors and exposed slabs. Speech carries because there is nothing for it to land on.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Climate and durability

Durability in Milan, before acoustics is discussed

Milan is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Before you buy

What we watch go wrong on jobs like this

  • Absorbing the whole room and losing the back rows

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Adding speakers to fix a reverberation problem

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Ignoring the rear wall because it is behind the audience

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating it as a generic Milan job

    Hard floors, glass and high ceilings are the look. Absorption has to go where it does the work and disappears, usually the ceiling plane and the upper wall.

05 / Route to site

Supply into Milan, start to site

Supply into Milan
Ships fromPalwal, Haryana, India
Arrives atGenoa or La Spezia, then a short road run north
Dispatch4 to 7 working days
FreightSea via Genoa
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

Sea freight into Genoa or La Spezia, then road into Milan. Air freight for samples, colour approvals and urgent quantities.

FAQ

Questions from Milan projects

What makes auditorium acoustics and soundproofing different in Milan?

Churches, theatres and civic halls are stone and plaster volumes with decay times measured in seconds. Hard floors, glass and high ceilings are the look. Absorption has to go where it does the work and disappears, usually the ceiling plane and the upper wall.

Where should the budget go first on a Milan project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Milan?

No. We manufacture in India and supply into Milan. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Milan site?

ships from: Palwal, Haryana, India, arrives at: Genoa or La Spezia, then a short road run north, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.