For projects in Medina
Venue and restaurant acoustics in Medina
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What this material is and where it earns its place in Medina
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Work reaching us from Medina is mostly new hotels, residential towers, assembly and function halls, offices, clinics, schools.
- Decisions still on paper On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
- Large halls, long reverberation Big assembly spaces in concrete and stone hold sound for a long time. Absorption has to be placed where it recovers intelligibility, not spread evenly to hit a number.
- Long programmes need consistent stock A tower fitted out over many months needs the last delivery to match the first. We hold batch consistency and tell you if a colour is changing.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Medina.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
The build-up, layer by layer
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Medina, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Wooden slat acoustic panels
Timber slats on an acoustic backing. In Medina, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Slats on felt backing. The standard. Absorption comes from the backing behind the gaps, so the slat gap ratio is an acoustic decision, not only a visual one.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Medina, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.
Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / Local conditions
The Medina conditions that change the answer
- Decisions still on paper
On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
- Large halls, long reverberation
Big assembly spaces in concrete and stone hold sound for a long time. Absorption has to be placed where it recovers intelligibility, not spread evenly to hit a number.
- Long programmes need consistent stock
A tower fitted out over many months needs the last delivery to match the first. We hold batch consistency and tell you if a colour is changing.
- Quiet city, loud buildings
The noise that reaches guests here is rarely from the street. It is the corridor, the next room and the plant, which is a detailing problem rather than a facade problem.
- Assembly and performance rooms
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
04 / Room by room
Space by space, for Medina briefs
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. Big assembly spaces in concrete and stone hold sound for a long time. Absorption has to be placed where it recovers intelligibility, not spread evenly to hit a number.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. A tower fitted out over many months needs the last delivery to match the first. We hold batch consistency and tell you if a colour is changing.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
For a Medina interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Conditions
Durability in Medina, before acoustics is discussed
Medina is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Straight talk
What we watch go wrong on jobs like this
-
Panels on the wall as a neighbour noise solution
It sounds like a small detail until the room is finished and the complaint arrives.
-
A lobby with both doors able to open at once
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Extract ducting that bypasses every wall you built
Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.
-
Treating it as a generic Medina job
On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
05 / Getting it there
What the route into Medina actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Jeddah or Yanbu, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Jeddah or Yanbu |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
Sea freight into Jeddah or Yanbu, then road to site. Air freight for samples and urgent quantities.
Questions from Medina projects
What makes venue and restaurant acoustics different in Medina?
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief. On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
Where should the budget go first on a Medina project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Medina?
No. We manufacture in India and supply into Medina. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Medina site?
ships from: Palwal, Haryana, India, arrives at: Jeddah or Yanbu, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.