For projects in Medina
Hospital and healthcare acoustics in Medina
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
- Consulting room privacy
- Speech privacy between rooms, which is partition, door and ceiling void work.
- Ward noise floor
- Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
- Cleanability
- Non shedding, non absorbent surfaces that survive a cleaning regime.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What this is, and what it changes in a Medina room
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.
Cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
Work reaching us from Medina is mostly new hotels, residential towers, assembly and function halls, offices, clinics, schools.
- Decisions still on paper On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
- Large halls, long reverberation Big assembly spaces in concrete and stone hold sound for a long time. Absorption has to be placed where it recovers intelligibility, not spread evenly to hit a number.
- Long programmes need consistent stock A tower fitted out over many months needs the last delivery to match the first. We hold batch consistency and tell you if a colour is changing.
- Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Medina.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Medina, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
-

Layer 2
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Medina, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Medina, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
For a Medina practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What we see driving Medina briefs
- Decisions still on paper
On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
- Large halls, long reverberation
Big assembly spaces in concrete and stone hold sound for a long time. Absorption has to be placed where it recovers intelligibility, not spread evenly to hit a number.
- Long programmes need consistent stock
A tower fitted out over many months needs the last delivery to match the first. We hold batch consistency and tell you if a colour is changing.
- Quiet city, loud buildings
The noise that reaches guests here is rarely from the street. It is the corridor, the next room and the plant, which is a detailing problem rather than a facade problem.
- Plant and HVAC
Cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
04 / Room by room
Space by space, for Medina briefs
-

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work. On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Acoustic carpet and rugs, 4 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. Big assembly spaces in concrete and stone hold sound for a long time. Absorption has to be placed where it recovers intelligibility, not spread evenly to hit a number.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Acoustic carpet and rugs, High density polyester
- Acoustic panels, ASTM C423
-

Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime. A tower fitted out over many months needs the last delivery to match the first. We hold batch consistency and tell you if a colour is changing.
- PET felt acoustic panels, 4 to 24 mm
- Acoustic carpet and rugs, Felt
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
For a Medina interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate and durability
Durability in Medina, before acoustics is discussed
Medina is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
On a Medina job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Read this first
The six errors that cost the most
-
Fabric wrapped products in a clinical area
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Absorption used where privacy was the requirement
Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.
-
Ceiling void left open above a partition
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating it as a generic Medina job
On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
05 / Route to site
Getting it to Medina, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Jeddah or Yanbu, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Jeddah or Yanbu |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
Sea freight into Jeddah or Yanbu, then road to site. Air freight for samples and urgent quantities.
Questions from Medina projects
What makes hospital and healthcare acoustics different in Medina?
Cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result. On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
Where should the budget go first on a Medina project?
Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Do you have an office or installation team in Medina?
No. We manufacture in India and supply into Medina. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Medina site?
ships from: Palwal, Haryana, India, arrives at: Jeddah or Yanbu, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
What goes wrong most often on this kind of project?
Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.