Home > Medina > Cinema and multiplex soundproofing

Premium multiplex cinema auditorium with acoustic treatment

For projects in Medina

Cinema and multiplex soundproofing in Medina

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.

Screen to screen
Independent construction between auditoria, with services broken at the line.
In room response
Heavy absorption on side and rear walls so the mix is heard as intended.
Plant and projection
Equipment noise into the auditorium, treated at source.
Quote
From a plan and a section, within 48 hours

01 / The material

What this is, and what it changes in a Medina room

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.

Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.

Work reaching us from Medina is mostly new hotels, residential towers, assembly and function halls, offices, clinics, schools.

  • Decisions still on paper On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.
  • Large halls, long reverberation Big assembly spaces in concrete and stone hold sound for a long time. Absorption has to be placed where it recovers intelligibility, not spread evenly to hit a number.
  • Long programmes need consistent stock A tower fitted out over many months needs the last delivery to match the first. We hold batch consistency and tell you if a colour is changing.
  • Screen to screen Independent construction between auditoria, with services broken at the line.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Medina.

Multiplex and cinema soundproofing

02 / The build-up

What goes where, from the structure in

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Medina, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Medina, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.

    Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.

  3. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 3

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Medina, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.

    Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / On the ground

What the buildings in Medina do to the specification

  • Decisions still on paper

    On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.

  • Large halls, long reverberation

    Big assembly spaces in concrete and stone hold sound for a long time. Absorption has to be placed where it recovers intelligibility, not spread evenly to hit a number.

  • Long programmes need consistent stock

    A tower fitted out over many months needs the last delivery to match the first. We hold batch consistency and tell you if a colour is changing.

  • Quiet city, loud buildings

    The noise that reaches guests here is rarely from the street. It is the corridor, the next room and the plant, which is a detailing problem rather than a facade problem.

  • Assembly and performance rooms

    Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.

04 / Room by room

What each space in a Medina project needs

  • Cinema hall with acoustic fabric wall system

    Screen to screen

    Independent construction between auditoria, with services broken at the line. On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.

  • Felt acoustic panels in multiplex cinema

    In room response

    Heavy absorption on side and rear walls so the mix is heard as intended. Big assembly spaces in concrete and stone hold sound for a long time. Absorption has to be placed where it recovers intelligibility, not spread evenly to hit a number.

  • Acoustic foams and bass traps in cinema hall

    Plant and projection

    Equipment noise into the auditorium, treated at source. A tower fitted out over many months needs the last delivery to match the first. We hold batch consistency and tell you if a colour is changing.

For a Medina interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

What the Medina climate rules in and rules out

Medina is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The failure we design against here is dust ingress and thermal movement in long runs.

On a Medina job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Straight talk

The six errors that cost the most

  • A shared service void running across the wall line

    A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.

  • Treating the auditorium to fix bleed from the next screen

    Small on the drawing, expensive on site, and almost always found after handover.

  • Doors and lobbies specified late and undersized

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Treating it as a generic Medina job

    On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.

05 / Getting it there

Supply into Medina, start to site

Supply into Medina
Ships fromPalwal, Haryana, India
Arrives atJeddah or Yanbu, then road to site
Dispatch4 to 7 working days
FreightSea via Jeddah or Yanbu
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

Sea freight into Jeddah or Yanbu, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Medina projects

What makes cinema and multiplex soundproofing different in Medina?

Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief. On a new build the isolation layer costs a fraction of what it costs to retrofit. Send the drawings early and we will mark where the build-up will fail before it is built.

Where should the budget go first on a Medina project?

Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.

Do you have an office or installation team in Medina?

No. We manufacture in India and supply into Medina. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Medina site?

ships from: Palwal, Haryana, India, arrives at: Jeddah or Yanbu, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

What goes wrong most often on this kind of project?

A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.