We manufacture ceiling baffles and clouds at our own plant at Palwal in Haryana, India, and supply them into Malaysia. Made at our own plant in India and shipped into Port Klang or Penang, both well served from western India.
- Material
- 100% PET non-woven, the panel family
- Thickness
- 9 to 24 mm
- Size
- Made to the drawing, standard and custom
- Exposure
- Both faces work, which is why suspended area outperforms the same area laid flat
- Test standard
- ASTM C423
- Lead time
- Confirmed against the drawing
- Minimum order
- 500 sq ft, about 46 sq m
- ASTM C423
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We make this ourselves and ship it to you. No local branch, no borrowed certifications, no dealer margin. One batch across the whole order, and an honest answer when the product is wrong for the problem.
01 / The product
What this is, and what it changes in a Malaysia room
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. It is how you treat a room with exposed services, where there is no ceiling to line.
Work reaching us from Malaysia is mostly electronics and manufacturing plants, hotels and resorts, offices, hospitals, schools, studios.
Concrete frame condominiums and terrace houses with hard tile floors throughout, sharing walls and slabs.
- Vertical baffles Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.
- Horizontal clouds Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.
- Mixed with services Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
- What it will not do Baffles are efficient, not magic. In a very tall volume the height above the baffle line still rings, and the honest answer is either more area or accepting a higher RT, not a denser panel.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for baffles and clouds are on the main product page. This page covers what that means for a project in Malaysia.
Acoustic ceiling baffles Acoustic ceiling clouds Acoustic ceiling tiles
02 / The numbers
One specification sheet, the same in every market
Nothing below changes by location. The decisions that do change are grade, thickness and how the material is mounted, and those are covered further down.
- EchoCore 151500 GSM. Offices, retail, general
- EchoPro 181800 GSM. Halls, atria, spaces with a target
- EchoMax 222200 GSM. High volume and high occupancy
| Material | 100% PET non-woven, the panel family |
|---|---|
| Thickness | 9 to 24 mm |
| Size | Made to the drawing, standard and custom |
| Exposure | Both faces work, which is why suspended area outperforms the same area laid flat |
| Test standard | ASTM C423 |
Where a consultant is already engaged on a Malaysia project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
03 / In this market
What the buildings in Malaysia do to the specification
- Tropical humidity year round
PET felt does not absorb moisture, shed fibre or feed mould. That decides whether a ceiling is still sound in five years.
- Plants and clean areas
Manufacturing floors need enclosure at the machine, and measurement rooms need a genuinely low background before any result means anything.
- Cooling loads never stop
Continuous mechanical plant close to occupied space causes more complaints than the rooms themselves.
- Two well served ports
Port Klang and Penang both run frequently from India, so we can route to whichever suits your site.
- School and campus buildings
Classrooms are hard and naturally ventilated with open corridors and large assembly halls.
For a Malaysia practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Climate and durability
Durability in Malaysia, before acoustics is discussed
Malaysia is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The risk we design against here is mould, sagging fabric finishes and swelling in timber.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Route to site
How material reaches a Malaysia site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Port Klang or Penang, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Port Klang |
| Packing | Flat packed with fixings, sets labelled by row so the install sequence matches the drawing. |
| Lead time | Confirmed against the drawing. Standard sizes 4 to 7 working days. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Port Klang or Penang, then road to site. Air freight for samples and urgent quantities.
The same 500 sq ft minimum applies on export.
| Baffles and clouds | 500 sq ft, about 46 sq m |
|---|
Baffles and clouds are cut to the drawing, so the minimum is counted on finished panel area. Both faces of a hung baffle absorb, which is why coverage taken off a plan understates what the order actually does.
06 / Straight talk
Where this goes wrong, said plainly
-
The wrong product for the problem
Baffles are efficient, not magic. In a very tall volume the height above the baffle line still rings, and the honest answer is either more area or accepting a higher RT, not a denser panel.
-
Square footage quoted before the room is understood
Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.
-
Local approvals that nobody actually holds
We hold no Malaysia certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.
Malaysia: questions we are actually asked
Where are the ceiling baffles and clouds you supply to Malaysia actually made?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Malaysia as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Port Klang or Penang, both well served from western India. You buy at factory prices with one consistent batch across the order.
Why would a Malaysia build-up differ from anywhere else?
Manufacturing floors need enclosure at the machine, and measurement rooms need a genuinely low background before any result means anything. PET felt does not absorb moisture, shed fibre or feed mould. That decides whether a ceiling is still sound in five years. Those two things move the build-up far more than the panel figure does.
Is this the right material for Malaysia conditions?
Malaysia is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.
How does an order actually travel to Malaysia?
ships from: Palwal, Haryana, India, arrives at: Port Klang or Penang, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
When are ceiling baffles and clouds the wrong purchase?
Baffles are efficient, not magic. In a very tall volume the height above the baffle line still rings, and the honest answer is either more area or accepting a higher RT, not a denser panel.
What is the minimum order and how is it packed?
The same 500 sq ft minimum applies on export. Baffles and clouds, 500 sq ft, about 46 sq m. Baffles and clouds are cut to the drawing, so the minimum is counted on finished panel area. Both faces of a hung baffle absorb, which is why coverage taken off a plan understates what the order actually does. Flat packed with fixings, sets labelled by row so the install sequence matches the drawing.
Next step
Send the drawings, get a straight answer
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.