For projects in Lisbon
School and classroom acoustics in Lisbon
Hard floors, bare walls and long corridors that amplify everything. Children with developing language, and anyone with a hearing difficulty, lose more from a live classroom than adults do, which is why intelligibility is the target rather than quiet. School buildings are hard surfaced with high ceilings, and canteens are the loudest rooms.
- Classroom RT
- A number, set against room volume, achieved mostly at the ceiling.
- Corridor spill
- Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once.
- Halls and gyms
- Dual use rooms carrying speech, music and sport, where durability decides the product.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this material is and where it earns its place in Lisbon
Hard floors, bare walls and long corridors that amplify everything. Children with developing language, and anyone with a hearing difficulty, lose more from a live classroom than adults do, which is why intelligibility is the target rather than quiet.
School buildings are hard surfaced with high ceilings, and canteens are the loudest rooms.
Work reaching us from Lisbon is mostly hotel and short let conversions, apartments, restaurants, offices, clinics, studios.
- Conversions put beds either side of old walls A house divided into guest rooms turns internal partitions into separating walls overnight. Doors and corridors generate more complaints than the walls themselves.
- Timber floors, every floor Footfall from above is the single most common complaint we hear from this city. It is a floor problem, and treating the ceiling below rarely fixes it.
- Hills and narrow streets Access decides the delivery. Tell us the street and the stairwell and we break pallets down to what will actually get to the room.
- Classroom RT A number, set against room volume, achieved mostly at the ceiling.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for school acoustics are on the main product page. This page covers what that means for a project in Lisbon.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
Wood wool acoustic panels
Wood fibre bound into a rigid board with an open texture. In Lisbon, split units with condensers in courtyards and light wells, plus seasonal heating in cold damp winters.
On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.
-

Layer 2
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Lisbon, church buildings, civic auditoria and function rooms are stone volumes with very long decay.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Lisbon, school buildings are hard surfaced with high ceilings, and canteens are the loudest rooms.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
For a Lisbon practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What the buildings in Lisbon do to the specification
- Conversions put beds either side of old walls
A house divided into guest rooms turns internal partitions into separating walls overnight. Doors and corridors generate more complaints than the walls themselves.
- Timber floors, every floor
Footfall from above is the single most common complaint we hear from this city. It is a floor problem, and treating the ceiling below rarely fixes it.
- Hills and narrow streets
Access decides the delivery. Tell us the street and the stairwell and we break pallets down to what will actually get to the room.
- Late districts under homes
Venues in the old districts operate directly beneath apartments. Low frequency containment is what keeps the operation trading.
- Assembly and performance rooms
Church buildings, civic auditoria and function rooms are stone volumes with very long decay.
- School and campus buildings
School buildings are hard surfaced with high ceilings, and canteens are the loudest rooms.
04 / Room by room
Room by room, on a typical Lisbon job
-

Classroom RT
A number, set against room volume, achieved mostly at the ceiling. A house divided into guest rooms turns internal partitions into separating walls overnight. Doors and corridors generate more complaints than the walls themselves.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Acoustic carpet and rugs, High density polyester
-

Corridor spill
Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once. Footfall from above is the single most common complaint we hear from this city. It is a floor problem, and treating the ceiling below rarely fixes it.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Acoustic carpet and rugs, Felt
-

Halls and gyms
Dual use rooms carrying speech, music and sport, where durability decides the product. Access decides the delivery. Tell us the street and the stairwell and we break pallets down to what will actually get to the room.
- PET felt acoustic panels, 4 to 24 mm
- Acoustic panels, ASTM C423
- Acoustic carpet and rugs, 64 sq ft per pack
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Durability
Why the climate in Lisbon changes the material, not the target
Lisbon is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.
The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.
The failure we design against here is seasonal movement in timber and winter damp in unheated stock.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Read this first
Where this kind of project usually fails
-
Panels at child height where they get damaged
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating one classroom and leaving the corridor
Small on the drawing, expensive on site, and almost always found after handover.
-
Choosing a product that cannot take a football
Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.
-
Treating it as a generic Lisbon job
A house divided into guest rooms turns internal partitions into separating walls overnight. Doors and corridors generate more complaints than the walls themselves.
05 / Supply
What the route into Lisbon actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Lisbon or Sines, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Lisbon or Sines |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Lisbon or Sines, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Lisbon projects
What makes school and classroom acoustics different in Lisbon?
School buildings are hard surfaced with high ceilings, and canteens are the loudest rooms. A house divided into guest rooms turns internal partitions into separating walls overnight. Doors and corridors generate more complaints than the walls themselves.
Where should the budget go first on a Lisbon project?
Classroom RT. A number, set against room volume, achieved mostly at the ceiling. Corridor spill. Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once.
Do you have an office or installation team in Lisbon?
No. We manufacture in India and supply into Lisbon. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Lisbon site?
ships from: Palwal, Haryana, India, arrives at: Lisbon or Sines, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Panels at child height where they get damaged. Treating one classroom and leaving the corridor.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.