Manufactured in India, supplied in Las Vegas
Soundproofing materials in Las Vegas
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Las Vegas. Made at our own plant in India, shipped into Long Beach and trucked across, with the road leg quoted separately so the dates are real.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / Start here
What you are buying, and what it fixes in Las Vegas
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Las Vegas is mostly venues and showrooms, hotels and casinos, conference and event space, offices, multifamily.
American homes are timber frame with gypsum board on both faces, so a party wall or a basement ceiling has almost no mass. Adding a second leaf with a limp membrane between does more than any amount of surface treatment.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Las Vegas.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
The numbers, and they do not move by city
The specification below is the same everywhere we supply, because a specification that changed by city would not be a specification. What changes is which grade and build-up is the right buy, and that is what the rest of this page is about.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
03 / Local conditions
What the buildings in Las Vegas do to the specification
- Rooms judged at full capacity
A showroom or venue behaves nothing like it does empty. The design has to work when the room is packed, which is when it is being assessed.
- Enormous volumes
Conference and event spaces with very large cubic volume hold sound for a long time. Absorption has to go where it recovers intelligibility.
- Extreme dry heat
PET felt does not sag, shed fibre or break down at high temperature, which matters in roof voids and plant spaces that get genuinely hot.
- No port, so plan the road leg
Everything arrives at Long Beach and drives. We quote the sea leg and the road leg separately.
- Plant and HVAC
Packaged rooftop units and ducted forced air are standard, so noise arrives through the duct rather than through the wall. Lining the first three metres of duct and treating the return path is usually the whole job.
- The housing stock
American homes are timber frame with gypsum board on both faces, so a party wall or a basement ceiling has almost no mass. Adding a second leaf with a limp membrane between does more than any amount of surface treatment.
For a Las Vegas practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Durability
The Las Vegas climate decides the material list
Las Vegas is mild summers and cold, wet winters, and that narrows the sensible material list before acoustics is even discussed.
Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.
The risk we design against here is condensation and cold bridging behind new linings.
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
05 / Route to site
What the route into Las Vegas actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Long Beach, then road across to Las Vegas |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Long Beach, then road |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Long Beach, then road across to Las Vegas. Air freight for samples and urgent quantities.
06 / Before you buy
The things worth knowing before you place the order
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
Suppliers who imply a Las Vegas presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
The product on finished jobs
Las Vegas: questions we are actually asked
Are these soundproofing materials made in Las Vegas?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Las Vegas as the manufacturer rather than through a dealer. Made at our own plant in India, shipped into Long Beach and trucked across, with the road leg quoted separately so the dates are real. You buy at factory prices with one consistent batch across the order.
Why would a Las Vegas build-up differ from anywhere else?
A showroom or venue behaves nothing like it does empty. The design has to work when the room is packed, which is when it is being assessed. Conference and event spaces with very large cubic volume hold sound for a long time. Absorption has to go where it recovers intelligibility. Those two things move the build-up far more than the panel figure does.
Is this the right material for Las Vegas conditions?
Las Vegas is mild summers and cold, wet winters. Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air. The failure we design against here is condensation and cold bridging behind new linings.
How does an order actually travel to Las Vegas?
ships from: Palwal, Haryana, India, arrives at: Long Beach, then road across to Las Vegas, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Where do soundproofing materials fail to help?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
What is the minimum order and how is it packed?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.