Manufactured in India, supplied in Kenya
Soundproofing materials in Kenya
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Kenya. Made at our own plant in India and shipped into Mombasa, a short and frequently served run from western India, then road inland to Nairobi.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.
01 / What it is
The product, described honestly, for a Kenya brief
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Kenya is mostly offices and corporate buildings, hotels and lodges, places of assembly, schools, hospitals.
Concrete and block apartment blocks and houses with hard floors, in developments where units share walls and slabs.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Kenya.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification
The published figures, unchanged by location
These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
03 / On the ground
What decides the build-up in Kenya
- A short sea leg from India
Western India to Mombasa is one of the quicker runs we operate, which makes modest and repeat consignments practical.
- A gateway, not just a destination
Material often continues inland to neighbouring countries. Tell us and we brace and pack for the second journey.
- Generators are routine
Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the fix.
- Large assembly spaces
Halls and places of assembly used by big congregations, where intelligibility fails well before the room is called echoey.
- Plant and HVAC
Split units and generator sets, with generators close to occupied areas during outages.
- The housing stock
Concrete and block apartment blocks and houses with hard floors, in developments where units share walls and slabs.
If you are specifying for a Kenya project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
04 / Conditions
What the Kenya climate rules in and rules out
Kenya is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The risk we design against here is mould, sagging fabric finishes and swelling in timber.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Logistics
What the route into Kenya actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Mombasa, then road inland or onward across borders |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Mombasa |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Mombasa, then road inland to Nairobi or onward across borders. Air freight for samples.
06 / Before you buy
Four honest warnings before you buy
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
Suppliers who imply a Kenya presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
The product on finished jobs
Kenya: questions we are actually asked
Do you manufacture soundproofing materials in Kenya?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Kenya as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Mombasa, a short and frequently served run from western India, then road inland to Nairobi. You buy at factory prices with one consistent batch across the order.
What do you look at first on a Kenya enquiry?
Western India to Mombasa is one of the quicker runs we operate, which makes modest and repeat consignments practical. Material often continues inland to neighbouring countries. Tell us and we brace and pack for the second journey. Those two things move the build-up far more than the panel figure does.
Is this the right material for Kenya conditions?
Kenya is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.
How quickly can material reach a site in Kenya?
ships from: Palwal, Haryana, India, arrives at: Mombasa, then road inland or onward across borders, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What should you not buy soundproofing materials for?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
Is there a minimum order, and how does it arrive?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Send the drawings, get a straight answer
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.