Home > Johannesburg > Home theatre soundproofing and acoustics
For projects in Johannesburg
Home theatre soundproofing and acoustics in Johannesburg
Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is. Brick and concrete construction with hard floors. Townhouse and cluster developments share walls that were built for structure, not for separation.
- Containment
- Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.
- Low frequency inside
- Corner absorption with depth, before any surface treatment.
- Reflections
- Side wall and ceiling first reflection points at the seating position.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The material, and what it actually does on a Johannesburg job
Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is.
Brick and concrete construction with hard floors. Townhouse and cluster developments share walls that were built for structure, not for separation.
Work reaching us from Johannesburg is mostly corporate office parks, generator enclosures, retail, hotels, schools, hospitals, studios.
- Generator noise is routine Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
- Office parks, not street frontage Campus style buildings with large open floors and hard finishes. Speech carries a long way and the ceiling plane has to carry the room.
- The climb from Durban The inland leg is long and it is real. We quote it separately so the programme is built on actual dates.
- Containment Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for home theatre soundproofing are on the main product page. This page covers what that means for a project in Johannesburg.
02 / The build-up
What goes where, from the structure in
-

Layer 1
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Johannesburg, split units and generator sets, with backup generation running often enough that its enclosure matters as much as the HVAC.
Corner loading. Low frequency energy collects in corners, so absorber in the corners does more than the same area spread across a wall.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Johannesburg, church buildings and community halls are large hard rooms carrying amplified music and speech at high level.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Johannesburg, classrooms are hard walled with high ceilings and large class sizes, and school halls double as assembly and performance spaces.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
For a Johannesburg practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / On the ground
What the buildings in Johannesburg do to the specification
- Generator noise is routine
Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
- Office parks, not street frontage
Campus style buildings with large open floors and hard finishes. Speech carries a long way and the ceiling plane has to carry the room.
- The climb from Durban
The inland leg is long and it is real. We quote it separately so the programme is built on actual dates.
- Altitude and dry air
PET felt is stable in dry conditions and does not shed fibre, which suits sealed, conditioned buildings.
- The housing stock
Brick and concrete construction with hard floors. Townhouse and cluster developments share walls that were built for structure, not for separation.
04 / Room by room
Room by room, on a typical Johannesburg job
-

Containment
Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point. Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
- Acoustic foam and BassBloc, 1800 x 900 mm
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Soundproof curtains, 5.5 kg per sq m
-

Low frequency inside
Corner absorption with depth, before any surface treatment. Campus style buildings with large open floors and hard finishes. Speech carries a long way and the ceiling plane has to carry the room.
- Acoustic foam and BassBloc, 20 mm
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Soundproof curtains, Up to 30 dB
-

Reflections
Side wall and ceiling first reflection points at the seating position. The inland leg is long and it is real. We quote it separately so the programme is built on actual dates.
- Acoustic foam and BassBloc, 100 kg per cubic metre
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Soundproof curtains, 30
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate
Durability in Johannesburg, before acoustics is discussed
Johannesburg is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
Where a consultant is already engaged on a Johannesburg project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Worth knowing
Where this kind of project usually fails
-
Foam on the walls as a soundproofing measure
It sounds like a small detail until the room is finished and the complaint arrives.
-
A standard door on a room built to hold bass
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating before the room is sealed
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating it as a generic Johannesburg job
Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
05 / Route to site
How material reaches a Johannesburg site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Durban, then road up to Johannesburg |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Durban |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Durban, then road up to Johannesburg. Air freight for samples and urgent quantities.
Questions from Johannesburg projects
What makes home theatre soundproofing and acoustics different in Johannesburg?
Brick and concrete construction with hard floors. Townhouse and cluster developments share walls that were built for structure, not for separation. Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
Where should the budget go first on a Johannesburg project?
Containment. Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point. Low frequency inside. Corner absorption with depth, before any surface treatment.
Do you have an office or installation team in Johannesburg?
No. We manufacture in India and supply into Johannesburg. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Johannesburg site?
ships from: Palwal, Haryana, India, arrives at: Durban, then road up to Johannesburg, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Foam on the walls as a soundproofing measure. A standard door on a room built to hold bass.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.