Home > Johannesburg > Auditorium acoustics and soundproofing
For projects in Johannesburg
Auditorium acoustics and soundproofing in Johannesburg
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Church buildings and community halls are large hard rooms carrying amplified music and speech at high level.
- Reverberation time
- Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
- Early reflections
- Shaped surfaces that send energy to the rear seats rather than absorbing everything.
- Rear wall
- The single worst surface in most halls, and the first one to treat.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The product, described honestly, for a Johannesburg brief
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.
Church buildings and community halls are large hard rooms carrying amplified music and speech at high level.
Work reaching us from Johannesburg is mostly corporate office parks, generator enclosures, retail, hotels, schools, hospitals, studios.
- Generator noise is routine Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
- Office parks, not street frontage Campus style buildings with large open floors and hard finishes. Speech carries a long way and the ceiling plane has to carry the room.
- The climb from Durban The inland leg is long and it is real. We quote it separately so the programme is built on actual dates.
- Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Johannesburg.
02 / The build-up
What goes where, from the structure in
-

Layer 1
Wooden slat acoustic panels
Timber slats on an acoustic backing. In Johannesburg, split units and generator sets, with backup generation running often enough that its enclosure matters as much as the HVAC.
Feature wall only. Slats where they are seen, plain felt elsewhere, to hold the budget where it shows.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Johannesburg, church buildings and community halls are large hard rooms carrying amplified music and speech at high level.
Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Johannesburg, classrooms are hard walled with high ceilings and large class sizes, and school halls double as assembly and performance spaces.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
If you are specifying for a Johannesburg project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What the buildings in Johannesburg do to the specification
- Generator noise is routine
Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
- Office parks, not street frontage
Campus style buildings with large open floors and hard finishes. Speech carries a long way and the ceiling plane has to carry the room.
- The climb from Durban
The inland leg is long and it is real. We quote it separately so the programme is built on actual dates.
- Altitude and dry air
PET felt is stable in dry conditions and does not shed fibre, which suits sealed, conditioned buildings.
- Assembly and performance rooms
Church buildings and community halls are large hard rooms carrying amplified music and speech at high level.
- School and campus buildings
Classrooms are hard walled with high ceilings and large class sizes, and school halls double as assembly and performance spaces.
04 / Room by room
What each space in a Johannesburg project needs
-

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
- Wood wool acoustic panels, 1200 x 600 mm
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Ceiling baffles and clouds, Made to the drawing, standard and custom
-

Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything. Campus style buildings with large open floors and hard finishes. Speech carries a long way and the ceiling plane has to carry the room.
- Wood wool acoustic panels, 20 mm
- PET felt acoustic panels, 4 to 24 mm
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
-

Rear wall
The single worst surface in most halls, and the first one to treat. The inland leg is long and it is real. We quote it separately so the programme is built on actual dates.
- Wood wool acoustic panels, 400 kg per cubic metre
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
- Ceiling baffles and clouds, ASTM C423
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Conditions
The Johannesburg climate decides the material list
Johannesburg is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Worth knowing
Six mistakes that turn into a second fit-out
-
Absorbing the whole room and losing the back rows
This is the one that comes back as a second fit-out rather than a snag.
-
Adding speakers to fix a reverberation problem
This is the one that comes back as a second fit-out rather than a snag.
-
Ignoring the rear wall because it is behind the audience
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating it as a generic Johannesburg job
Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
05 / Logistics
Supply into Johannesburg, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Durban, then road up to Johannesburg |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Durban |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Durban, then road up to Johannesburg. Air freight for samples and urgent quantities.
Questions from Johannesburg projects
What makes auditorium acoustics and soundproofing different in Johannesburg?
Church buildings and community halls are large hard rooms carrying amplified music and speech at high level. Standby plant runs often enough that it has to be treated as a permanent condition. Enclosure at the source is the only reliable answer.
Where should the budget go first on a Johannesburg project?
Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Do you have an office or installation team in Johannesburg?
No. We manufacture in India and supply into Johannesburg. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Johannesburg site?
ships from: Palwal, Haryana, India, arrives at: Durban, then road up to Johannesburg, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.