Home > Indonesia > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in Indonesia

Recording studio acoustics and soundproofing in Indonesia

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A large content and music scene works out of rooms in commercial buildings with thin partitions and constant neighbouring activity.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / Start here

The material, and what it actually does on a Indonesia job

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

A large content and music scene works out of rooms in commercial buildings with thin partitions and constant neighbouring activity.

Work reaching us from Indonesia is mostly offices and towers, hotels and resorts, manufacturing plants, hospitals, schools, studios.

  • An onward leg is normal Material often continues by road or inter-island ferry after the port. Tell us and we brace and wrap for the second journey.
  • Tropical humidity all year PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag within a couple of seasons.
  • Dense cities, constant traffic Street noise reaches rooms through openings and glazing long before it comes through the wall. Fix the weakest path first.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Indonesia.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

The build-up, layer by layer

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Indonesia, split units everywhere, with condensers on balconies and light wells that channel noise straight back into bedrooms.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Indonesia, places of worship, function halls and community buildings are large hard rooms carrying amplified speech and music.

    Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.

  3. ...

    Layer 3

    Soundproof curtains

    A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Indonesia, classrooms are hard, naturally ventilated and open to corridor and street noise, so absorption alone will not fix intelligibility.

    Full height with return. Curtain taken floor to soffit with a side return and an overlap, because the gap is what leaks, not the fabric.

If you are specifying for a Indonesia project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / In this market

The Indonesia conditions that change the answer

  • An onward leg is normal

    Material often continues by road or inter-island ferry after the port. Tell us and we brace and wrap for the second journey.

  • Tropical humidity all year

    PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag within a couple of seasons.

  • Dense cities, constant traffic

    Street noise reaches rooms through openings and glazing long before it comes through the wall. Fix the weakest path first.

  • Manufacturing at scale

    Plant noise where enclosure and mass do the work, and measurement rooms that need a genuinely low background.

  • The housing stock

    Concrete frame with block infill in cities, timber and light construction outside them. Apartment stock shares walls and slabs that were never detailed for two households.

  • The studio and content scene

    A large content and music scene works out of rooms in commercial buildings with thin partitions and constant neighbouring activity.

04 / Room by room

Where the money goes on a Indonesia project

For a Indonesia interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

Durability in Indonesia, before acoustics is discussed

Indonesia is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

Where a consultant is already engaged on a Indonesia project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Before you buy

The six errors that cost the most

  • Buying foam to solve an isolation problem

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating the room before the shell is isolated

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Killing the room completely and calling it controlled

    More absorption is not better absorption. Past the target the room goes flat and people raise their voices to compensate.

  • Treating it as a generic Indonesia job

    Material often continues by road or inter-island ferry after the port. Tell us and we brace and wrap for the second journey.

05 / Getting it there

Supply into Indonesia, start to site

Supply into Indonesia
Ships fromPalwal, Haryana, India
Arrives atTanjung Priok, then road or onward by sea
Dispatch4 to 7 working days
FreightSea via Tanjung Priok
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Tanjung Priok, then road or inter-island onward. Air freight for samples and urgent quantities.

FAQ

Questions from Indonesia projects

What makes recording studio acoustics and soundproofing different in Indonesia?

A large content and music scene works out of rooms in commercial buildings with thin partitions and constant neighbouring activity. Material often continues by road or inter-island ferry after the port. Tell us and we brace and wrap for the second journey.

Where should the budget go first on a Indonesia project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Indonesia?

No. We manufacture in India and supply into Indonesia. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Indonesia site?

ships from: Palwal, Haryana, India, arrives at: Tanjung Priok, then road or onward by sea, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.